An Entity of Type: Railway104048568, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Halton Railway was a spur line from Wendover to RAF Halton used to transport coal and other goods to RAF Halton. It closed in 1963. Opened in 1917 after an eight-week construction period, the branch line ran for 1.75 miles (2.82 km) and was constructed by German prisoners of war during World War I. The railway was originally built to carry building materials into the site for construction of the workshops and other units. It also forwarded coal to the boilers on camp. It was later converted from a narrow gauge of 1 ft 11+1⁄2 in (597 mm) to 4 ft 8+1⁄2 in (1,435 mm) standard gauge and was used to bring timber out of . The conversion of boilers on the station from coal fired to oil fired, allowed road-tankers to take over the inward flow of fuel and accelerated the demise of the railway and t

Property Value
dbo:abstract
  • Halton Railway was a spur line from Wendover to RAF Halton used to transport coal and other goods to RAF Halton. It closed in 1963. Opened in 1917 after an eight-week construction period, the branch line ran for 1.75 miles (2.82 km) and was constructed by German prisoners of war during World War I. The railway was originally built to carry building materials into the site for construction of the workshops and other units. It also forwarded coal to the boilers on camp. It was later converted from a narrow gauge of 1 ft 11+1⁄2 in (597 mm) to 4 ft 8+1⁄2 in (1,435 mm) standard gauge and was used to bring timber out of . The conversion of boilers on the station from coal fired to oil fired, allowed road-tankers to take over the inward flow of fuel and accelerated the demise of the railway and the last train ran on 29 March 1963 with closure following two days afterwards. The majority of the track has since been removed, including the original bridge over the Grand Union Canal which was replaced by a modern footbridge, however much of the line is designated a permissive footpath (rail trail). (en)
dbo:thumbnail
dbo:wikiPageID
  • 7090311 (xsd:integer)
dbo:wikiPageLength
  • 2795 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 988563228 (xsd:integer)
dbo:wikiPageWikiLink
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
rdf:type
rdfs:comment
  • Halton Railway was a spur line from Wendover to RAF Halton used to transport coal and other goods to RAF Halton. It closed in 1963. Opened in 1917 after an eight-week construction period, the branch line ran for 1.75 miles (2.82 km) and was constructed by German prisoners of war during World War I. The railway was originally built to carry building materials into the site for construction of the workshops and other units. It also forwarded coal to the boilers on camp. It was later converted from a narrow gauge of 1 ft 11+1⁄2 in (597 mm) to 4 ft 8+1⁄2 in (1,435 mm) standard gauge and was used to bring timber out of . The conversion of boilers on the station from coal fired to oil fired, allowed road-tankers to take over the inward flow of fuel and accelerated the demise of the railway and t (en)
rdfs:label
  • Halton Railway (en)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License