An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Warm Springs/South Fremont station is a Bay Area Rapid Transit (BART) station located in the Warm Springs district of Fremont, California, United States. The East Bay station is served by the Berryessa/North San José–Daly City line and Berryessa/North San José–Richmond line. It was the southern terminus of both lines from its opening on March 25, 2017, until June 13, 2020, when BART opened the first phase of the Silicon Valley BART extension.

Property Value
dbo:abstract
  • Warm Springs/South Fremont station is a Bay Area Rapid Transit (BART) station located in the Warm Springs district of Fremont, California, United States. The East Bay station is served by the Berryessa/North San José–Daly City line and Berryessa/North San José–Richmond line. It was the southern terminus of both lines from its opening on March 25, 2017, until June 13, 2020, when BART opened the first phase of the Silicon Valley BART extension. The station has an island platform between the surface-level BART tracks, with a fare mezzanine above the platform. A footbridge connects the mezzanine to a rotunda which serves as the station entrance. (en)
  • Warm Springs/South Fremont is een metrostation in de Amerikaanse stad Fremont (Californië). Het station werd op 25 maart 2017 het zuidelijke eindpunt van het BART-net. Het is het eerste station van de verlenging naar Silicon Valley dat werd geopend. De eerste plannen voor de verlenging dateren uit 1994 maar pas in 2009 werd begonnen met de aanleg ten zuiden van station Fremont. De bouw duurde langer dan de verwachte vijf jaar. Irvington werd vooralsnog niet gebouwd en zal pas in 2026 worden opgeleverd. De eerste twee stations ten zuiden van Warm Springs zijn op 13 juni 2020 geopend terwijl de rest van de verlenging tot Santa Clara in Silicon Valley nog in de ontwerpfase verkeert. (nl)
dbo:address
  • Fremont, California (en)
  • (en)
  • 45193 Warm Springs Boulevard (en)
dbo:bicycleInformation
  • Yes
dbo:isHandicappedAccessible
  • 1 (xsd:boolean)
dbo:openingDate
  • 2017-03-25 (xsd:date)
dbo:openingYear
  • 2017-01-01 (xsd:gYear)
dbo:otherServingLines
  • AC Transit: 215, 217, 239
dbo:owner
dbo:owningOrganisation
dbo:parkingInformation
  • 2,082 spaces (42EV)
dbo:railwayPlatforms
  • 1island platform
dbo:servingRailwayLine
dbo:thumbnail
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 35931613 (xsd:integer)
dbo:wikiPageLength
  • 15788 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1113220699 (xsd:integer)
dbo:wikiPageWikiLink
dbp:ada
  • Yes (en)
dbp:address
dbp:bicycle
  • Yes (en)
dbp:caption
  • Warm Springs/South Fremont station in June 2018 (en)
dbp:line
dbp:mapframe
  • yes (en)
dbp:mapframeZoom
  • 14 (xsd:integer)
dbp:name
  • Warm Springs/South Fremont (en)
dbp:opened
  • 2017-03-25 (xsd:date)
dbp:other
  • AC Transit: 215, 217, 239 (en)
dbp:owned
dbp:parking
  • 2082 (xsd:integer)
dbp:platform
  • 1 (xsd:integer)
dbp:style
  • BART (en)
dbp:symbol
  • yes (en)
dbp:symbolLocation
  • BART (en)
dbp:wikiPageUsesTemplate
dcterms:subject
georss:point
  • 37.503 -121.94
rdf:type
rdfs:comment
  • Warm Springs/South Fremont is een metrostation in de Amerikaanse stad Fremont (Californië). Het station werd op 25 maart 2017 het zuidelijke eindpunt van het BART-net. Het is het eerste station van de verlenging naar Silicon Valley dat werd geopend. De eerste plannen voor de verlenging dateren uit 1994 maar pas in 2009 werd begonnen met de aanleg ten zuiden van station Fremont. De bouw duurde langer dan de verwachte vijf jaar. Irvington werd vooralsnog niet gebouwd en zal pas in 2026 worden opgeleverd. De eerste twee stations ten zuiden van Warm Springs zijn op 13 juni 2020 geopend terwijl de rest van de verlenging tot Santa Clara in Silicon Valley nog in de ontwerpfase verkeert. (nl)
  • Warm Springs/South Fremont station is a Bay Area Rapid Transit (BART) station located in the Warm Springs district of Fremont, California, United States. The East Bay station is served by the Berryessa/North San José–Daly City line and Berryessa/North San José–Richmond line. It was the southern terminus of both lines from its opening on March 25, 2017, until June 13, 2020, when BART opened the first phase of the Silicon Valley BART extension. (en)
rdfs:label
  • Warm Springs/South Fremont (nl)
  • Warm Springs/South Fremont station (en)
owl:sameAs
geo:geometry
  • POINT(-121.94000244141 37.502998352051)
geo:lat
  • 37.502998 (xsd:float)
geo:long
  • -121.940002 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • (en)
  • Warm Springs/South Fremont (en)
is dbo:wikiPageDisambiguates of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License