dbo:abbreviation
| |
dbo:abstract
|
- The Metropolitan Commission of Sewers was one of London's first steps towards bringing its sewer and drainage infrastructure under the control of a single public body. It was absorbed by the Metropolitan Board of Works on 1 January 1856. (en)
|
dbo:foundingDate
| |
dbo:headquarter
| |
dbo:leaderFunction
| |
dbo:membership
| |
dbo:parentOrganisation
| |
dbo:purpose
|
- Public health, sewerage, drainage
|
dbo:regionServed
| |
dbo:status
| |
dbo:successor
| |
dbo:wikiPageID
| |
dbo:wikiPageLength
|
- 5136 (xsd:nonNegativeInteger)
|
dbo:wikiPageRevisionID
| |
dbo:wikiPageWikiLink
| |
dbp:abbreviation
| |
dbp:boardOfDirectors
| |
dbp:dissolved
| |
dbp:formation
| |
dbp:headquarters
| |
dbp:leaderName
| |
dbp:leaderTitle
|
- Chairman (en)
- Engineer (en)
|
dbp:locationCity
| |
dbp:locationCountry
| |
dbp:membership
| |
dbp:membershipYear
| |
dbp:name
|
- Metropolitan Commission of Sewers (en)
|
dbp:origins
|
- Metropolitan Commission of Sewers Act 1848 (en)
|
dbp:parentOrganization
| |
dbp:predecessor
|
- Sewer commissions of: (en)
|
dbp:purpose
|
- Public health, sewerage, drainage (en)
|
dbp:regionServed
| |
dbp:status
| |
dbp:successor
| |
dbp:type
| |
dbp:wikiPageUsesTemplate
| |
dcterms:subject
| |
gold:hypernym
| |
georss:point
| |
rdf:type
| |
rdfs:comment
|
- The Metropolitan Commission of Sewers was one of London's first steps towards bringing its sewer and drainage infrastructure under the control of a single public body. It was absorbed by the Metropolitan Board of Works on 1 January 1856. (en)
|
rdfs:label
|
- Metropolitan Commission of Sewers (en)
|
owl:sameAs
| |
geo:geometry
|
- POINT(-0.1313000023365 51.51490020752)
|
geo:lat
| |
geo:long
| |
prov:wasDerivedFrom
| |
foaf:isPrimaryTopicOf
| |
foaf:name
|
- Metropolitan Commission of Sewers (en)
|
is dbo:successor
of | |
is dbo:wikiPageRedirects
of | |
is dbo:wikiPageWikiLink
of | |
is dbp:precededBy
of | |
is dbp:successor
of | |
is foaf:primaryTopic
of | |