An Entity of Type: Thing, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The METRO Purple Line, formerly known as the Rush Line Corridor, is a proposed bus rapid transit service that would run from Union Depot in downtown Saint Paul to the northeastern suburbs of Saint Paul. Along the corridor's 21 proposed stations there are 106,000 jobs within a 10-minute walk. The project is currently in an environmental analysis phase with further development, engineering, and construction expected to take at least six more years. Service would run 7-days a week with 10-minute headways in peak periods and 15-minute service at most other times. The corridor was named the Rush Line because it was originally planned to end in Rush City, Minnesota. After using the color purple since 2017, the route was officially named the Purple Line and became part of the METRO network on Jul

Property Value
dbo:abstract
  • The METRO Purple Line, formerly known as the Rush Line Corridor, is a proposed bus rapid transit service that would run from Union Depot in downtown Saint Paul to the northeastern suburbs of Saint Paul. Along the corridor's 21 proposed stations there are 106,000 jobs within a 10-minute walk. The project is currently in an environmental analysis phase with further development, engineering, and construction expected to take at least six more years. Service would run 7-days a week with 10-minute headways in peak periods and 15-minute service at most other times. The corridor was named the Rush Line because it was originally planned to end in Rush City, Minnesota. After using the color purple since 2017, the route was officially named the Purple Line and became part of the METRO network on July 14, 2021. (en)
dbo:thumbnail
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 7650944 (xsd:integer)
dbo:wikiPageLength
  • 17266 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1118803663 (xsd:integer)
dbo:wikiPageWikiLink
dbp:bgcolor
  • #782b90 (en)
dbp:boxWidth
  • 270 (xsd:integer)
dbp:day
  • max (en)
dbp:end
  • Downtown St. Paul (en)
dbp:length
  • 15.0
dbp:locale
dbp:logo
  • Metro Minnesota icon.svg (en)
dbp:logoWidth
  • 30 (xsd:integer)
dbp:number
  • Purple Line (en)
dbp:ridership
  • 7400 (xsd:integer)
dbp:routetype
dbp:start
  • White Bear Lake (en)
dbp:stations
  • 21 (xsd:integer)
dbp:status
  • Planning Stages (en)
dbp:system
dbp:titlecolor
  • white (en)
dbp:wikiPageUsesTemplate
dcterms:subject
rdfs:comment
  • The METRO Purple Line, formerly known as the Rush Line Corridor, is a proposed bus rapid transit service that would run from Union Depot in downtown Saint Paul to the northeastern suburbs of Saint Paul. Along the corridor's 21 proposed stations there are 106,000 jobs within a 10-minute walk. The project is currently in an environmental analysis phase with further development, engineering, and construction expected to take at least six more years. Service would run 7-days a week with 10-minute headways in peak periods and 15-minute service at most other times. The corridor was named the Rush Line because it was originally planned to end in Rush City, Minnesota. After using the color purple since 2017, the route was officially named the Purple Line and became part of the METRO network on Jul (en)
rdfs:label
  • Metro Purple Line (Minnesota) (en)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:homepage
foaf:isPrimaryTopicOf
is dbo:wikiPageDisambiguates of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License