dbo:Infrastructure/length
| |
dbo:abstract
|
- Jerusalem Road 20 is a combination of existing roads and new construction creating a continuous route between Jerusalem's Highway 50 (Begin Boulevard) and Pisgat Ze'ev via Beit Hanina. The number "20" is a designation used by the Jerusalem Municipality. Several segments of the road follow national road 4197. The cost of the project was NIS 180 million and was completed on 5 May 2013. (en)
|
dbo:buildingEndDate
| |
dbo:length
| |
dbo:routeEnd
| |
dbo:routeEndDirection
| |
dbo:routeStartDirection
| |
dbo:thumbnail
| |
dbo:wikiPageID
| |
dbo:wikiPageLength
|
- 15252 (xsd:nonNegativeInteger)
|
dbo:wikiPageRevisionID
| |
dbo:wikiPageWikiLink
| |
dbp:completionDate
| |
dbp:country
| |
dbp:directionA
| |
dbp:directionB
| |
dbp:imageMap
|
- Jerusalem Road 20 OSM map 2.png (en)
|
dbp:junction
| |
dbp:lengthKm
| |
dbp:name
|
- (en)
- Jerusalem Road 20 (en)
|
dbp:terminusA
| |
dbp:terminusB
|
- Junction at Highway 60 (en)
|
dbp:wikiPageUsesTemplate
| |
dcterms:subject
| |
gold:hypernym
| |
georss:point
|
- 31.829444444444444 35.22611111111111
|
rdf:type
| |
rdfs:comment
|
- Jerusalem Road 20 is a combination of existing roads and new construction creating a continuous route between Jerusalem's Highway 50 (Begin Boulevard) and Pisgat Ze'ev via Beit Hanina. The number "20" is a designation used by the Jerusalem Municipality. Several segments of the road follow national road 4197. The cost of the project was NIS 180 million and was completed on 5 May 2013. (en)
|
rdfs:label
| |
owl:sameAs
| |
geo:geometry
|
- POINT(35.226112365723 31.829444885254)
|
geo:lat
| |
geo:long
| |
prov:wasDerivedFrom
| |
foaf:depiction
| |
foaf:isPrimaryTopicOf
| |
foaf:name
| |
is dbo:wikiPageWikiLink
of | |
is foaf:primaryTopic
of | |