dbo:Infrastructure/length
| |
dbo:abstract
|
- Jerusalem Road 21 is a road beginning at Highway 1 between Ramat Shlomo and Shu'afat northward to Beit Hanina and the Atarot Industrial Park. Plans call for a boulevard with two lanes in each direction. Construction is expected to cost NIS 112 million and was originally expected to be completed by January 2015. The first three sections of the road and part of the fourth section were completed in 2020. (en)
|
dbo:buildingEndDate
| |
dbo:isPartOfName
|
- Atarot Convoy Road
- דרך שיירת עטרות
|
dbo:length
| |
dbo:routeEnd
| |
dbo:routeEndDirection
| |
dbo:routeStart
| |
dbo:routeStartDirection
| |
dbo:thumbnail
| |
dbo:wikiPageID
| |
dbo:wikiPageLength
|
- 19026 (xsd:nonNegativeInteger)
|
dbo:wikiPageRevisionID
| |
dbo:wikiPageWikiLink
| |
dbp:alternateName
|
- Atarot Convoy Road (en)
- דרך שיירת עטרות (en)
|
dbp:completionDate
| |
dbp:directionA
| |
dbp:directionB
| |
dbp:imageMap
|
- Jerusalem Road 21 OSM map 2.png (en)
|
dbp:lengthKm
| |
dbp:name
|
- (en)
- Jerusalem Road 21 (en)
|
dbp:terminusA
| |
dbp:terminusB
|
- Beit Horon Road, Atarot (en)
|
dbp:wikiPageUsesTemplate
| |
dcterms:subject
| |
gold:hypernym
| |
georss:point
|
- 31.819444444444443 35.221944444444446
|
rdf:type
| |
rdfs:comment
|
- Jerusalem Road 21 is a road beginning at Highway 1 between Ramat Shlomo and Shu'afat northward to Beit Hanina and the Atarot Industrial Park. Plans call for a boulevard with two lanes in each direction. Construction is expected to cost NIS 112 million and was originally expected to be completed by January 2015. The first three sections of the road and part of the fourth section were completed in 2020. (en)
|
rdfs:label
| |
owl:sameAs
| |
geo:geometry
|
- POINT(35.221942901611 31.819444656372)
|
geo:lat
| |
geo:long
| |
prov:wasDerivedFrom
| |
foaf:depiction
| |
foaf:isPrimaryTopicOf
| |
foaf:name
| |
is dbo:wikiPageWikiLink
of | |
is foaf:primaryTopic
of | |