An Entity of Type: agent, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org:8891

The Sheffield, Ashton-under-Lyne and Manchester Railway was an early British railway company which opened in stages between 1841 and 1845 between Sheffield and Manchester via Ashton-under-Lyne. The Peak District formed a formidable barrier, and the line's engineer constructed Woodhead Tunnel, over three miles (4.8 km) long. The company amalgamated with the Sheffield and Lincolnshire Junction Railway and Great Grimsby and Sheffield Junction Railway companies, together forming the Manchester, Sheffield and Lincolnshire Railway in 1847.

Property Value
dbo:abstract
  • The Sheffield, Ashton-under-Lyne and Manchester Railway was an early British railway company which opened in stages between 1841 and 1845 between Sheffield and Manchester via Ashton-under-Lyne. The Peak District formed a formidable barrier, and the line's engineer constructed Woodhead Tunnel, over three miles (4.8 km) long. The company amalgamated with the Sheffield and Lincolnshire Junction Railway and Great Grimsby and Sheffield Junction Railway companies, together forming the Manchester, Sheffield and Lincolnshire Railway in 1847. In the twentieth century the line carried an exceptionally heavy freight traffic, and it was electrified in 1954; at that time a new Woodhead Tunnel was driven. In 1974 the major part of the route was closed to passenger trains, leaving passenger operation continuing only on the Manchester–Hadfield section, and in 1981 the line east of Hadfield closed completely. The Manchester–Hadfield–Glossop section and a branch to Stalybridge remain in use. (en)
dbo:closingYear
  • 1847-01-01 (xsd:gYear)
dbo:openingYear
  • 1841-01-01 (xsd:gYear)
dbo:thumbnail
dbo:wikiPageID
  • 4225859 (xsd:integer)
dbo:wikiPageLength
  • 27781 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1053711030 (xsd:integer)
dbo:wikiPageWikiLink
dbp:endYear
  • 1847 (xsd:integer)
dbp:railroadName
  • Sheffield, Ashton-under-Lyne and Manchester Railway (en)
dbp:startYear
  • 1841 (xsd:integer)
dbp:successorLine
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
rdf:type
rdfs:comment
  • The Sheffield, Ashton-under-Lyne and Manchester Railway was an early British railway company which opened in stages between 1841 and 1845 between Sheffield and Manchester via Ashton-under-Lyne. The Peak District formed a formidable barrier, and the line's engineer constructed Woodhead Tunnel, over three miles (4.8 km) long. The company amalgamated with the Sheffield and Lincolnshire Junction Railway and Great Grimsby and Sheffield Junction Railway companies, together forming the Manchester, Sheffield and Lincolnshire Railway in 1847. (en)
rdfs:label
  • Sheffield, Ashton-under-Lyne and Manchester Railway (en)
rdfs:seeAlso
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Sheffield, Ashton-under-Lyne and Manchester Railway (en)
is dbo:predecessor of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is dbp:original of
is dbp:predecessor of
is dbp:pregroup of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License