Nador West Med is a planned deep water port, to be located about 30 km from Nador, Morocco. In 2016, a consortium consisting of STFA Group, the (SGTM) and Jan De Nul were selected to build the infrastructure at a projected cost of 7,61 billion dirhams (roughly 800 M$). Construction was originally supposed to last 5 years but is now scheduled to be complete by late 2022 with an opening in 2024.

Property Value
dbo:abstract
  • Nador West Med is a planned deep water port, to be located about 30 km from Nador, Morocco. In 2016, a consortium consisting of STFA Group, the (SGTM) and Jan De Nul were selected to build the infrastructure at a projected cost of 7,61 billion dirhams (roughly 800 M$). Construction was originally supposed to last 5 years but is now scheduled to be complete by late 2022 with an opening in 2024. (en)
  • Nador West Med (Nador Med) est un futur port marocain de transbordement pétrolier qui sera érigé dans la baie de Betoya, située au niveau de l'estuaire de l'oued Kert, à 30 km à l'ouest de la ville de Nador, dans la région du Rif oriental, au nord-est du Maroc. La composante conteneurs de Nador West Med porte sur une capacité de 3 millions MEV égalant les capacités de Tanger Med avant les travaux de son agrandissement. L'extension optionnelle du port de Nador West Med est chiffrée à deux millions de MEV, contrairement à l'extension actuelle de Tanger Med qui se trouve en phase de parachèvement aucune date précise n'est avancée concernant le projet d’agrandissement ultérieur de Nador West Med. (fr)
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 27106858 (xsd:integer)
dbo:wikiPageLength
  • 2205 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1051484433 (xsd:integer)
dbo:wikiPageWikiLink
dbp:country
dbp:location
dbp:name
  • Port of Nador West Med (en)
dbp:website
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
georss:point
  • 35.271971 -3.102608
rdf:type
rdfs:comment
  • Nador West Med is a planned deep water port, to be located about 30 km from Nador, Morocco. In 2016, a consortium consisting of STFA Group, the (SGTM) and Jan De Nul were selected to build the infrastructure at a projected cost of 7,61 billion dirhams (roughly 800 M$). Construction was originally supposed to last 5 years but is now scheduled to be complete by late 2022 with an opening in 2024. (en)
  • Nador West Med (Nador Med) est un futur port marocain de transbordement pétrolier qui sera érigé dans la baie de Betoya, située au niveau de l'estuaire de l'oued Kert, à 30 km à l'ouest de la ville de Nador, dans la région du Rif oriental, au nord-est du Maroc. La composante conteneurs de Nador West Med porte sur une capacité de 3 millions MEV égalant les capacités de Tanger Med avant les travaux de son agrandissement. L'extension optionnelle du port de Nador West Med est chiffrée à deux millions de MEV, contrairement à l'extension actuelle de Tanger Med qui se trouve en phase de parachèvement aucune date précise n'est avancée concernant le projet d’agrandissement ultérieur de Nador West Med. (fr)
rdfs:label
  • Nador West Med (fr)
  • Nador West Med (en)
owl:sameAs
geo:geometry
  • POINT(-3.1026079654694 35.27197265625)
geo:lat
  • 35.271973 (xsd:float)
geo:long
  • -3.102608 (xsd:float)
prov:wasDerivedFrom
foaf:homepage
foaf:isPrimaryTopicOf
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License