An Entity of Type: Thing, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The King Street Transit Priority Corridor is a transit mall located along King Street between Jarvis and Bathurst Streets in Toronto, Ontario, Canada. It passes by two subway stations (King and St. Andrew) on Line 1 Yonge–University. The corridor was created by the King Street Pilot Project to improve streetcar reliability on downtown King Street. The corridor went into operation on November 12, 2017, and was made permanent by City Council on April 16, 2019. The corridor is 2.6 km (1.6 mi) long and spans 18 street intersections.

Property Value
dbo:abstract
  • The King Street Transit Priority Corridor is a transit mall located along King Street between Jarvis and Bathurst Streets in Toronto, Ontario, Canada. It passes by two subway stations (King and St. Andrew) on Line 1 Yonge–University. The corridor was created by the King Street Pilot Project to improve streetcar reliability on downtown King Street. The corridor went into operation on November 12, 2017, and was made permanent by City Council on April 16, 2019. The corridor is 2.6 km (1.6 mi) long and spans 18 street intersections. (en)
dbo:thumbnail
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 62403650 (xsd:integer)
dbo:wikiPageLength
  • 33585 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1099743663 (xsd:integer)
dbo:wikiPageWikiLink
dbp:caption
  • The pilot project converted some parts of the curbside traffic lane into patios with furniture and planters. (en)
dbp:display
  • title,inline (en)
dbp:end
  • Bathurst Street (en)
dbp:from
  • 504 (xsd:integer)
dbp:imageWidth
  • 250 (xsd:integer)
dbp:locale
dbp:name
  • King Street Transit Priority Corridor (en)
dbp:open
  • 2017-11-12 (xsd:date)
dbp:operator
dbp:routetype
dbp:start
  • Jarvis Street (en)
dbp:wikiPageUsesTemplate
dcterms:subject
rdfs:comment
  • The King Street Transit Priority Corridor is a transit mall located along King Street between Jarvis and Bathurst Streets in Toronto, Ontario, Canada. It passes by two subway stations (King and St. Andrew) on Line 1 Yonge–University. The corridor was created by the King Street Pilot Project to improve streetcar reliability on downtown King Street. The corridor went into operation on November 12, 2017, and was made permanent by City Council on April 16, 2019. The corridor is 2.6 km (1.6 mi) long and spans 18 street intersections. (en)
rdfs:label
  • King Street Transit Priority Corridor (en)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:homepage
foaf:isPrimaryTopicOf
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is rdfs:seeAlso of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License