An Entity of Type: mean of transportation, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The Great Western Railway Premier Class 0-6-0 broad gauge steam locomotives for goods train work. This class was introduced into service between February 1846 and May 1847, and withdrawn between March 1866 and June 1872. These were the first locomotives built at Swindon railway works, albeit with boilers supplied to the company. They were larger than the existing Hercules Class but still with haycock fireboxes. Just six months after the last one left Swindon, production of the even larger Pyracmon Class had started.

Property Value
dbo:abstract
  • The Great Western Railway Premier Class 0-6-0 broad gauge steam locomotives for goods train work. This class was introduced into service between February 1846 and May 1847, and withdrawn between March 1866 and June 1872. These were the first locomotives built at Swindon railway works, albeit with boilers supplied to the company. They were larger than the existing Hercules Class but still with haycock fireboxes. Just six months after the last one left Swindon, production of the even larger Pyracmon Class had started. From about 1865, the Premier Class locomotives became part of the Fury Class, along with the Hercules Class locomotives. (en)
dbo:builder
dbo:designer
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 1381577 (xsd:integer)
dbo:wikiPageLength
  • 4211 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1099404068 (xsd:integer)
dbo:wikiPageWikiLink
dbp:builder
dbp:cylindersize
  • , dia × stroke (en)
dbp:designer
dbp:disposition
  • All scrapped (en)
dbp:name
  • Premier (en)
dbp:operator
dbp:operatorclass
  • Premier (en)
dbp:powertype
  • Steam (en)
dbp:whytetype
  • 0 (xsd:integer)
dbp:wikiPageUsesTemplate
dbp:withdrawndate
  • 1866 (xsd:integer)
dbp:wordnet_type
dcterms:subject
rdf:type
rdfs:comment
  • The Great Western Railway Premier Class 0-6-0 broad gauge steam locomotives for goods train work. This class was introduced into service between February 1846 and May 1847, and withdrawn between March 1866 and June 1872. These were the first locomotives built at Swindon railway works, albeit with boilers supplied to the company. They were larger than the existing Hercules Class but still with haycock fireboxes. Just six months after the last one left Swindon, production of the even larger Pyracmon Class had started. (en)
rdfs:label
  • GWR Premier Class (en)
owl:sameAs
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
foaf:name
  • Premier (en)
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License