The Chernobyl Shelter Fund (CSF) was set up in December 1997 with the purpose of funding the Shelter Implementation Plan (SIP). The aim of the fund is to create conditions for the dismantling and decomposition of the radiation contaminated structures. At the end of the eight- to nine-year project, estimated to cost US$768 million, the Shelter will be transformed into a stable and environmentally safe system for an estimated 100 years. The most visible aspect of this transformation will be the construction of the New Safe Confinement. The European Bank for Reconstruction and Development (EBRD) was entrusted with managing the CSF.
Attributes | Values |
---|
rdfs:label
| - Chernobyl Shelter Fund (en)
- 車諾比基金 (zh)
|
rdfs:comment
| - The Chernobyl Shelter Fund (CSF) was set up in December 1997 with the purpose of funding the Shelter Implementation Plan (SIP). The aim of the fund is to create conditions for the dismantling and decomposition of the radiation contaminated structures. At the end of the eight- to nine-year project, estimated to cost US$768 million, the Shelter will be transformed into a stable and environmentally safe system for an estimated 100 years. The most visible aspect of this transformation will be the construction of the New Safe Confinement. The European Bank for Reconstruction and Development (EBRD) was entrusted with managing the CSF. (en)
- 切爾諾貝爾基金(英語:Chernobyl Shelter Fund,CSF),設於1997年12月,旨在爲遮蔽執行計劃(Shelter Implementation Plan,SIP)籌集資金。該計劃由歐盟、美國與烏克蘭共同發起,主要目標是在發生核事故的烏克蘭切尔诺贝利核电站第4號機組外圍建造一個新的遮蔽結構體,把原來的遺址轉變成一個符合生態要求,安全穩定至少100年的石棺。原計劃預估花費7億6千8百萬美元。歐洲重建和發展銀行受託管理切爾諾貝爾基金。 (zh)
|
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
has abstract
| - The Chernobyl Shelter Fund (CSF) was set up in December 1997 with the purpose of funding the Shelter Implementation Plan (SIP). The aim of the fund is to create conditions for the dismantling and decomposition of the radiation contaminated structures. At the end of the eight- to nine-year project, estimated to cost US$768 million, the Shelter will be transformed into a stable and environmentally safe system for an estimated 100 years. The most visible aspect of this transformation will be the construction of the New Safe Confinement. The European Bank for Reconstruction and Development (EBRD) was entrusted with managing the CSF. (en)
- 切爾諾貝爾基金(英語:Chernobyl Shelter Fund,CSF),設於1997年12月,旨在爲遮蔽執行計劃(Shelter Implementation Plan,SIP)籌集資金。該計劃由歐盟、美國與烏克蘭共同發起,主要目標是在發生核事故的烏克蘭切尔诺贝利核电站第4號機組外圍建造一個新的遮蔽結構體,把原來的遺址轉變成一個符合生態要求,安全穩定至少100年的石棺。原計劃預估花費7億6千8百萬美元。歐洲重建和發展銀行受託管理切爾諾貝爾基金。 (zh)
|
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
foaf:isPrimaryTopicOf
| |
is Link from a Wikipage to another Wikipage
of | |
is Wikipage redirect
of | |
is foaf:primaryTopic
of | |