Officially opened on May 10, 2012, as a part of University at Buffalo's 2020 Strategic Plan, construction of Barbara and Jack Davis Hall, known as Davis Hall, started in 2009 with ground-breaking and finished in late 2011 with a construction cost of $75 million including nearly $49.6 million from New York State funding and the rest from corporate and individual endowments. Besides UB Engineering, Davis Hall is the new host to both Computer Science and Electrical Engineering departments featuring several new laboratories and research centers.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Barbara and Jack Davis Hall (en)
|
rdfs:comment
| - Officially opened on May 10, 2012, as a part of University at Buffalo's 2020 Strategic Plan, construction of Barbara and Jack Davis Hall, known as Davis Hall, started in 2009 with ground-breaking and finished in late 2011 with a construction cost of $75 million including nearly $49.6 million from New York State funding and the rest from corporate and individual endowments. Besides UB Engineering, Davis Hall is the new host to both Computer Science and Electrical Engineering departments featuring several new laboratories and research centers. (en)
|
foaf:name
| - Barbara and Jack Davis Hall (en)
|
foaf:homepage
| |
name
| - Barbara and Jack Davis Hall (en)
|
geo:lat
| |
geo:long
| |
location
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
architect
| |
architecture firm
| |
awards
| - LEED Gold Certificate (en)
|
building type
| |
client
| |
completion date
| |
cost
| |
current tenants
| |
floor count
| |
groundbreaking date
| |
location
| |
main contractor
| |
opened date
| |
owner
| |
website
| |
georss:point
| |
has abstract
| - Officially opened on May 10, 2012, as a part of University at Buffalo's 2020 Strategic Plan, construction of Barbara and Jack Davis Hall, known as Davis Hall, started in 2009 with ground-breaking and finished in late 2011 with a construction cost of $75 million including nearly $49.6 million from New York State funding and the rest from corporate and individual endowments. Besides UB Engineering, Davis Hall is the new host to both Computer Science and Electrical Engineering departments featuring several new laboratories and research centers. The building is constructed by Turner Construction and its exterior design is a reminiscent to printed circuit board representing interaction among faculties and students and is designed by Perkins and Will firm. The building is constructed in accordance with LEED's Gold certificate standards. (en)
|
prov:wasDerivedFrom
| |
floor area (m2)
| |
page length (characters) of wiki page
| |
building end date
| |
building start date
| |
cost ($)
| |
floor area (m2)
| |
floor count
| |
opening date
| |
architect
| |
award
| |
owner
| |
type
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(-78.787147521973 43.002796173096)
|
is Link from a Wikipage to another Wikipage
of | |
is Wikipage redirect
of | |