Officially opened on May 10, 2012, as a part of University at Buffalo's 2020 Strategic Plan, construction of Barbara and Jack Davis Hall, known as Davis Hall, started in 2009 with ground-breaking and finished in late 2011 with a construction cost of $75 million including nearly $49.6 million from New York State funding and the rest from corporate and individual endowments. Besides UB Engineering, Davis Hall is the new host to both Computer Science and Electrical Engineering departments featuring several new laboratories and research centers.

AttributesValues
rdf:type
rdfs:label
  • Barbara and Jack Davis Hall (en)
rdfs:comment
  • Officially opened on May 10, 2012, as a part of University at Buffalo's 2020 Strategic Plan, construction of Barbara and Jack Davis Hall, known as Davis Hall, started in 2009 with ground-breaking and finished in late 2011 with a construction cost of $75 million including nearly $49.6 million from New York State funding and the rest from corporate and individual endowments. Besides UB Engineering, Davis Hall is the new host to both Computer Science and Electrical Engineering departments featuring several new laboratories and research centers. (en)
foaf:name
  • Barbara and Jack Davis Hall (en)
foaf:homepage
name
  • Barbara and Jack Davis Hall (en)
geo:lat
geo:long
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
architect
  • Robert Goodwin (en)
architecture firm
awards
  • LEED Gold Certificate (en)
building type
client
completion date
  • Late 2011 (en)
cost
current tenants
floor count
groundbreaking date
  • May 2009 (en)
location
main contractor
opened date
owner
website
georss:point
  • 43.002795 -78.787145
has abstract
  • Officially opened on May 10, 2012, as a part of University at Buffalo's 2020 Strategic Plan, construction of Barbara and Jack Davis Hall, known as Davis Hall, started in 2009 with ground-breaking and finished in late 2011 with a construction cost of $75 million including nearly $49.6 million from New York State funding and the rest from corporate and individual endowments. Besides UB Engineering, Davis Hall is the new host to both Computer Science and Electrical Engineering departments featuring several new laboratories and research centers. The building is constructed by Turner Construction and its exterior design is a reminiscent to printed circuit board representing interaction among faculties and students and is designed by Perkins and Will firm. The building is constructed in accordance with LEED's Gold certificate standards. (en)
prov:wasDerivedFrom
floor area (m2)
page length (characters) of wiki page
building end date
  • Late 2011
building start date
  • May 2009
cost ($)
floor area (m2)
floor count
opening date
architect
award
owner
type
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-78.787147521973 43.002796173096)
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (62 GB total memory, 48 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software