An Entity of Type: Educational, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Officially opened on May 10, 2012, as a part of University at Buffalo's 2020 Strategic Plan, construction of Barbara and Jack Davis Hall, known as Davis Hall, started in 2009 with ground-breaking and finished in late 2011 with a construction cost of $75 million including nearly $49.6 million from New York State funding and the rest from corporate and individual endowments. Besides UB Engineering, Davis Hall is the new host to both Computer Science and Electrical Engineering departments featuring several new laboratories and research centers.

Property Value
dbo:Building/floorArea
  • 12077.3952
dbo:abstract
  • Officially opened on May 10, 2012, as a part of University at Buffalo's 2020 Strategic Plan, construction of Barbara and Jack Davis Hall, known as Davis Hall, started in 2009 with ground-breaking and finished in late 2011 with a construction cost of $75 million including nearly $49.6 million from New York State funding and the rest from corporate and individual endowments. Besides UB Engineering, Davis Hall is the new host to both Computer Science and Electrical Engineering departments featuring several new laboratories and research centers. The building is constructed by Turner Construction and its exterior design is a reminiscent to printed circuit board representing interaction among faculties and students and is designed by Perkins and Will firm. The building is constructed in accordance with LEED's Gold certificate standards. (en)
dbo:architect
dbo:award
dbo:buildingEndDate
  • Late 2011
dbo:buildingStartDate
  • May 2009
dbo:cost
  • 7.5E7
dbo:floorArea
  • 12077.395200 (xsd:double)
dbo:floorCount
  • 3 (xsd:positiveInteger)
dbo:location
dbo:openingDate
  • 2012-05-10 (xsd:date)
dbo:owner
dbo:type
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 39543221 (xsd:integer)
dbo:wikiPageLength
  • 7655 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1030837300 (xsd:integer)
dbo:wikiPageWikiLink
dbp:architect
  • Robert Goodwin (en)
dbp:architectureFirm
dbp:awards
  • LEED Gold Certificate (en)
dbp:buildingType
dbp:client
dbp:completionDate
  • Late 2011 (en)
dbp:cost
  • 7.5E7
dbp:currentTenants
dbp:floorCount
  • 3 (xsd:integer)
dbp:groundbreakingDate
  • May 2009 (en)
dbp:location
dbp:mainContractor
dbp:name
  • Barbara and Jack Davis Hall (en)
dbp:openedDate
  • 2012-05-10 (xsd:date)
dbp:owner
dbp:website
dbp:wikiPageUsesTemplate
dcterms:subject
georss:point
  • 43.002795 -78.787145
rdf:type
rdfs:comment
  • Officially opened on May 10, 2012, as a part of University at Buffalo's 2020 Strategic Plan, construction of Barbara and Jack Davis Hall, known as Davis Hall, started in 2009 with ground-breaking and finished in late 2011 with a construction cost of $75 million including nearly $49.6 million from New York State funding and the rest from corporate and individual endowments. Besides UB Engineering, Davis Hall is the new host to both Computer Science and Electrical Engineering departments featuring several new laboratories and research centers. (en)
rdfs:label
  • Barbara and Jack Davis Hall (en)
owl:sameAs
geo:geometry
  • POINT(-78.787147521973 43.002796173096)
geo:lat
  • 43.002796 (xsd:float)
geo:long
  • -78.787148 (xsd:float)
prov:wasDerivedFrom
foaf:homepage
foaf:isPrimaryTopicOf
foaf:name
  • Barbara and Jack Davis Hall (en)
is dbo:wikiPageDisambiguates of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License