The West Coast Expressway (E32) is an interstate controlled-access highway running along the west coast of Peninsular Malaysia. The 233-kilometre (145-mile) expressway is currently under construction, with several sections open for public use. Once completed, the expressway will run between Changkat Jering, Perak and Banting, Selangor, following federal routes 5 and 60 for most of its route. The expressway will operate in three sections, with sections of federal route 5 completing the missing connections; these sections will be upgraded to limited-access roads. The expressway is expected to be fully completed by the end of 2024, except for a 10 km stretch from Section 7B which is expected to be completed by June 2026.

Property Value
dbo:Infrastructure/length
  • 233.0
dbo:abstract
  • The West Coast Expressway (E32) is an interstate controlled-access highway running along the west coast of Peninsular Malaysia. The 233-kilometre (145-mile) expressway is currently under construction, with several sections open for public use. Once completed, the expressway will run between Changkat Jering, Perak and Banting, Selangor, following federal routes 5 and 60 for most of its route. The expressway will operate in three sections, with sections of federal route 5 completing the missing connections; these sections will be upgraded to limited-access roads. The expressway is expected to be fully completed by the end of 2024, except for a 10 km stretch from Section 7B which is expected to be completed by June 2026. The expressway is being built by Konsortium Lebuhraya Pantai Barat. Approval was given by the government for the construction, which was to begin from 20 December 2013 and was to be completed within five years. It originally was given route code E28 but later changed to E32, and E28 was used by Sultan Abdul Halim Muadzam Shah Bridge. The project was delayed and actual construction began in May 2014. Currently, a 9.7-kilometre (6.0 mi) segment between Kapar and Bukit Raja, a 19-kilometre (12 mi) segment from Hutan Melintang to Teluk Intan and a 45-kilometre (28 mi) segment from Lekir to Beruas are opened to traffic. Once the expressway is completed, it will be the fourth longest in Peninsular Malaysia, after the North-South Expressway Northern Route, the East Coast Expressway and the North-South Expressway Southern Route. (en)
  • 西海岸大道(馬來語:Lebuhraya Pantai Barat;英語:West Coast Expressway,简称“WCE”)是马来西亚半岛西海岸的一条高速公路,由北部的霹雳州太平连接至南部的雪兰莪州瓜拉冷岳万津,全长233公里。该大道于2014年5月开始施工,目前已完成90%工程,预料将在2022年建成,比原定完成日期延迟了2年。于2019年5月开放部分道路通行。 西海岸大道由马来西亚公共工程部(JKR)和特许经营商WCE控股公司的子公司西海岸大道有限公司(West Coast Expressway Sdn Bhd)联合开发。西海岸大道有限公司拥有该大道特许经营权,收费期限为50年。 (zh)
dbo:length
  • 233000.000000 (xsd:double)
dbo:routeEnd
dbo:routeEndDirection
  • South
dbo:routeJunction
dbo:routeNumber
  • 32
dbo:routeStart
dbo:routeStartDirection
  • North
dbo:routeTypeAbbreviation
  • E
dbo:thumbnail
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 4508125 (xsd:integer)
dbo:wikiPageLength
  • 20002 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1121971511 (xsd:integer)
dbo:wikiPageWikiLink
dbp:alternateName
  • West Coast Expressway (en)
dbp:country
  • MYS (en)
dbp:destinations
dbp:directionA
  • North (en)
dbp:directionB
  • South (en)
dbp:established
  • 2014 (xsd:integer)
dbp:headerType
  • under construction (en)
dbp:history
  • Opened in stages from June 2019, expected completion in 2024. (en)
dbp:junction
  • Federal Highway (en)
  • Shah Alam Expressway (en)
  • Kuala Lumpur–Kuala Selangor Expressway (en)
  • Federal route 5 (en)
  • Jalan Batu Tiga Lama (en)
  • South Klang Valley Expressway (en)
  • New North Klang Straits Bypass (en)
  • Federal route 58 (en)
dbp:lengthKm
  • 233 (xsd:integer)
dbp:maint
  • West Coast Expressway Sdn Bhd (en)
dbp:mapCustom
  • yes (en)
dbp:route
  • 32 (xsd:integer)
dbp:status
  • 3 (xsd:integer)
dbp:terminusA
  • Federal route 60 and North–South Expressway Northern Route at Changkat Jering, Perak (en)
dbp:terminusB
  • Jalan Banting–Dengkil at Banting, Selangor (en)
dbp:type
  • E (en)
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
rdf:type
rdfs:comment
  • 西海岸大道(馬來語:Lebuhraya Pantai Barat;英語:West Coast Expressway,简称“WCE”)是马来西亚半岛西海岸的一条高速公路,由北部的霹雳州太平连接至南部的雪兰莪州瓜拉冷岳万津,全长233公里。该大道于2014年5月开始施工,目前已完成90%工程,预料将在2022年建成,比原定完成日期延迟了2年。于2019年5月开放部分道路通行。 西海岸大道由马来西亚公共工程部(JKR)和特许经营商WCE控股公司的子公司西海岸大道有限公司(West Coast Expressway Sdn Bhd)联合开发。西海岸大道有限公司拥有该大道特许经营权,收费期限为50年。 (zh)
  • The West Coast Expressway (E32) is an interstate controlled-access highway running along the west coast of Peninsular Malaysia. The 233-kilometre (145-mile) expressway is currently under construction, with several sections open for public use. Once completed, the expressway will run between Changkat Jering, Perak and Banting, Selangor, following federal routes 5 and 60 for most of its route. The expressway will operate in three sections, with sections of federal route 5 completing the missing connections; these sections will be upgraded to limited-access roads. The expressway is expected to be fully completed by the end of 2024, except for a 10 km stretch from Section 7B which is expected to be completed by June 2026. (en)
rdfs:label
  • West Coast Expressway (en)
  • 西海岸大道 (zh)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • West Coast Expressway (en)
is dbo:locatedInArea of
is dbo:routeJunction of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License