About: SM UB-145

An Entity of Type: ship, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

UB-145 was a German Type UB III submarine or U-boat built for the German Imperial Navy (German: Kaiserliche Marine) during World War I. Incomplete at the end of the war, she was surrendered to the Allies at Harwich on 27 March 1919, and then taken to Chatham Dockyard as a potential subject for experimental work, but was never so-employed. She was sold to M. Lynch & Sons on 22 July 1920 for £2,000, and towed to Rochester, Kent. After being stripped of any reusable material, the hulk was dumped in shallow water in the Medway estuary, along with those of UB-144 and UB-150. The remains of all three - partly broken up in-situ during 1939–45, with one significantly better preserved than the other two - remain visible, but it is unclear which wreck is which.

Property Value
dbo:MeanOfTransportation/length
  • 55850.0
dbo:abstract
  • يو بي-145 غواصة ألمانية من فئة يو بي3 خدمت في البحرية الإمبراطورية الألمانية خلال الحرب العالمية الأولى. (ar)
  • UB-145 was a German Type UB III submarine or U-boat built for the German Imperial Navy (German: Kaiserliche Marine) during World War I. Incomplete at the end of the war, she was surrendered to the Allies at Harwich on 27 March 1919, and then taken to Chatham Dockyard as a potential subject for experimental work, but was never so-employed. She was sold to M. Lynch & Sons on 22 July 1920 for £2,000, and towed to Rochester, Kent. After being stripped of any reusable material, the hulk was dumped in shallow water in the Medway estuary, along with those of UB-144 and UB-150. The remains of all three - partly broken up in-situ during 1939–45, with one significantly better preserved than the other two - remain visible, but it is unclear which wreck is which. (en)
  • 陛下之UB-145号艇(德語:SM UB 145)是德意志帝国海军于第一次世界大战期间建造的其中一艘UB-III型或称U艇。其全长55.85米,水面及水下排水量分别为523吨和653吨,艇载武器则包括五具500毫米鱼雷发射管以及一门105毫米口径。该艇由不来梅的威悉船厂承建,于1918年11月5日新船下水,却未及在战争结束前。根据对德停战协定的要求,UB-145号在战后继续建造完成,继而于1919年3月27日被引渡至英国哈维奇正式向协约国投降,并最终于1939-1945年间在拆解报废。 (zh)
dbo:builder
dbo:class
dbo:completionDate
  • 1919-03-27 (xsd:date)
dbo:country
dbo:layingDown
  • 1918-04-15 (xsd:date)
dbo:length
  • 55.850000 (xsd:double)
dbo:orderDate
  • 1917-06-27 (xsd:date)
dbo:shipBeam
  • 5.800000 (xsd:double)
dbo:shipDisplacement
  • 523000000.000000 (xsd:double)
  • 653000000.000000 (xsd:double)
dbo:status
  • Surrendered 27 March 1919; sold for scrap 22 July 1920; hulk dumped in Medway estuary 1922
dbo:thumbnail
dbo:topSpeed
  • 25.002000 (xsd:double)
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 39446981 (xsd:integer)
dbo:wikiPageLength
  • 5894 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1050872409 (xsd:integer)
dbo:wikiPageWikiLink
dbp:isMulti
  • yes (en)
dbp:isShip
  • yes (en)
dbp:operations
  • No patrols (en)
dbp:shipArmament
  • *5 × torpedo tubes *10 torpedoes *1 × deck gun (en)
dbp:shipBuilder
dbp:shipClass
dbp:shipComplement
  • 3 (xsd:integer)
dbp:shipCompleted
  • 0001-03-27 (xsd:gMonthDay)
dbp:shipCountry
dbp:shipDisplacement
  • * surfaced * submerged (en)
dbp:shipFate
  • 0001-03-27 (xsd:gMonthDay)
dbp:shipLaidDown
  • 1918-04-15 (xsd:date)
dbp:shipLaunched
  • October 1918 (en)
dbp:shipName
  • UB-145 (en)
dbp:shipOrdered
  • 0001-06-27 (xsd:gMonthDay)
dbp:shipOriginalCost
  • 4301000 (xsd:integer)
dbp:shipPropulsion
  • *2 × propeller shaft *2 × Benz four-stroke 6-cylinder diesel engines, *2 × Schiffsunion electric motors, (en)
dbp:shipRange
  • * at surfaced * at submerged (en)
dbp:shipSpeed
  • * surfaced * submerged (en)
dbp:shipYardNumber
  • 311 (xsd:integer)
dbp:victories
  • None (en)
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
georss:point
  • 51.42611111111111 0.6311111111111111
rdf:type
rdfs:comment
  • يو بي-145 غواصة ألمانية من فئة يو بي3 خدمت في البحرية الإمبراطورية الألمانية خلال الحرب العالمية الأولى. (ar)
  • UB-145 was a German Type UB III submarine or U-boat built for the German Imperial Navy (German: Kaiserliche Marine) during World War I. Incomplete at the end of the war, she was surrendered to the Allies at Harwich on 27 March 1919, and then taken to Chatham Dockyard as a potential subject for experimental work, but was never so-employed. She was sold to M. Lynch & Sons on 22 July 1920 for £2,000, and towed to Rochester, Kent. After being stripped of any reusable material, the hulk was dumped in shallow water in the Medway estuary, along with those of UB-144 and UB-150. The remains of all three - partly broken up in-situ during 1939–45, with one significantly better preserved than the other two - remain visible, but it is unclear which wreck is which. (en)
  • 陛下之UB-145号艇(德語:SM UB 145)是德意志帝国海军于第一次世界大战期间建造的其中一艘UB-III型或称U艇。其全长55.85米,水面及水下排水量分别为523吨和653吨,艇载武器则包括五具500毫米鱼雷发射管以及一门105毫米口径。该艇由不来梅的威悉船厂承建,于1918年11月5日新船下水,却未及在战争结束前。根据对德停战协定的要求,UB-145号在战后继续建造完成,继而于1919年3月27日被引渡至英国哈维奇正式向协约国投降,并最终于1939-1945年间在拆解报废。 (zh)
rdfs:label
  • غواصة يو بي-145 (ar)
  • SM UB-145 (en)
  • UB-145号潜艇 (zh)
owl:sameAs
geo:geometry
  • POINT(0.63111108541489 51.426109313965)
geo:lat
  • 51.426109 (xsd:float)
geo:long
  • 0.631111 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • UB-145 (en)
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License