About: SM U-115

An Entity of Type: ship, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

SM U-115 was a German Type U 115 U-boat (Projekt 43) of the Imperial German Navy built at Schichau-Werke, Elbing. As her sister ship SM U-116, she was never completed and ultimately broken up in Danzig after the armistice. Her main engines were used in M/S Adolf Sommerfeld ex SMS Gefion. Both boats had been offered to the IGN free of charge by Schichau in an attempt to gain experience in building submarines. When construction of the two boats began to lag behind due to shortages in raw materials and lack of experience in submarine construction they were declared "war boats" (Kriegsboote), formally ordered by the Reichsmarineamt and given their respective designation. On 20 October 1918 Schichau-Werke reported U 115 would not be ready for delivery until the spring of 1919. Nevertheless 14 m

Property Value
dbo:MeanOfTransportation/length
  • 72300.0
dbo:abstract
  • يو-115 هي غواصة تابعة للإمبراطورية الألمانية. في 20 أكتوبر 1918 تم الإبلاغ من الشركة المصنعة لن تكون جاهزًة للتسليم حتى ربيع عام 1919. ومع ذلك، فقد تم طلب 14 غواصة إضافيًة من فئتها في 29 يونيو 1918 ليتم تسليمها في عام 1919. (ar)
  • SM U-115 was a German Type U 115 U-boat (Projekt 43) of the Imperial German Navy built at Schichau-Werke, Elbing. As her sister ship SM U-116, she was never completed and ultimately broken up in Danzig after the armistice. Her main engines were used in M/S Adolf Sommerfeld ex SMS Gefion. Both boats had been offered to the IGN free of charge by Schichau in an attempt to gain experience in building submarines. When construction of the two boats began to lag behind due to shortages in raw materials and lack of experience in submarine construction they were declared "war boats" (Kriegsboote), formally ordered by the Reichsmarineamt and given their respective designation. On 20 October 1918 Schichau-Werke reported U 115 would not be ready for delivery until the spring of 1919. Nevertheless 14 more boats of the class were ordered on 29 June 1918 for delivery in 1919. (en)
  • 陛下之115号潜艇(德語:SM U 115)是德意志帝国海军于第一次世界大战期间建造的一艘中型潜艇或称U艇。它由埃尔宾的承建,自1916年9月,至1918年下水。但受制于战时物资紧缺和船厂经验匮乏,该艇从未完工,最终于停战后在但泽拆解报废。 (zh)
dbo:builder
dbo:class
dbo:country
dbo:length
  • 72.300000 (xsd:double)
dbo:shipBeam
  • 6.500000 (xsd:double)
dbo:shipDisplacement
  • 882000000.000000 (xsd:double)
  • 1233000000.000000 (xsd:double)
dbo:status
  • never completed, broken up at Danzig
dbo:topSpeed
  • 29.632000 (xsd:double)
dbo:wikiPageID
  • 19789844 (xsd:integer)
dbo:wikiPageLength
  • 4413 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1121493360 (xsd:integer)
dbo:wikiPageWikiLink
dbp:shipArmament
  • *6 × torpedo tubes *1 × L/45 and *1 × L/30 deck gun (en)
dbp:shipBuilder
dbp:shipClass
dbp:shipComplement
  • 4 (xsd:integer)
dbp:shipCountry
dbp:shipDisplacement
  • * surfaced * submerged (en)
dbp:shipFate
  • never completed, broken up at Danzig (en)
dbp:shipLaidDown
  • September 1916 (en)
dbp:shipLaunched
  • 1918 (xsd:integer)
dbp:shipName
  • U-115 (en)
dbp:shipOriginalCost
  • 4100000 (xsd:integer)
dbp:shipPropulsion
  • *2 shafts *2 × MAN four-stroke diesel motors with *2 × SSW double dynamos with *450 rpm surfaced *330 rpm submerged (en)
dbp:shipRange
  • * at 8 kn surfaced * at 4.5 kn submerged (en)
dbp:shipSpeed
  • * surfaced * submerged (en)
dbp:shipYardNumber
  • 987 (xsd:integer)
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • يو-115 هي غواصة تابعة للإمبراطورية الألمانية. في 20 أكتوبر 1918 تم الإبلاغ من الشركة المصنعة لن تكون جاهزًة للتسليم حتى ربيع عام 1919. ومع ذلك، فقد تم طلب 14 غواصة إضافيًة من فئتها في 29 يونيو 1918 ليتم تسليمها في عام 1919. (ar)
  • 陛下之115号潜艇(德語:SM U 115)是德意志帝国海军于第一次世界大战期间建造的一艘中型潜艇或称U艇。它由埃尔宾的承建,自1916年9月,至1918年下水。但受制于战时物资紧缺和船厂经验匮乏,该艇从未完工,最终于停战后在但泽拆解报废。 (zh)
  • SM U-115 was a German Type U 115 U-boat (Projekt 43) of the Imperial German Navy built at Schichau-Werke, Elbing. As her sister ship SM U-116, she was never completed and ultimately broken up in Danzig after the armistice. Her main engines were used in M/S Adolf Sommerfeld ex SMS Gefion. Both boats had been offered to the IGN free of charge by Schichau in an attempt to gain experience in building submarines. When construction of the two boats began to lag behind due to shortages in raw materials and lack of experience in submarine construction they were declared "war boats" (Kriegsboote), formally ordered by the Reichsmarineamt and given their respective designation. On 20 October 1918 Schichau-Werke reported U 115 would not be ready for delivery until the spring of 1919. Nevertheless 14 m (en)
rdfs:label
  • غواصة يو-115 (ar)
  • SM U-115 (en)
  • U-115号潜艇 (1918年) (zh)
owl:sameAs
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
foaf:name
  • U-115 (en)
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License