dbo:abstract
|
- Beim Praya East Reclamation Project (chinesisch 海旁東填海計劃 / 海旁东填海计划, Pinyin Hǎipáng Dōng tiánhǎi jìhuà, Jyutping Hoi2pong4 Dung1 tin4hoi2 gai3waak6, englisch Praya East Reclamation Scheme) zur Landgewinnung in Hongkong betrieb die Sang Lee & Co. um 1921–1929 zwei Feldbahnen mit Spurweiten von 600 mm und 1067 mm (3½ Fuß). (de)
- Praya East Reclamation Scheme (Chinese: 海旁東填海計劃) was a large scale land reclamation project in Colonial Hong Kong lasting from 1921 to 1931 under Sir Catchick Paul Chater. (en)
- 海旁東填海計劃(Praya East Reclamation Scheme),又稱灣仔海旁填海計劃、東區海旁填海計劃,是香港20世紀初的一項主要填海工程。該工程於1921年開始,並於1931年全面完成,使香港島的下環得到大片填海土地。 (zh)
|
dbo:thumbnail
| |
dbo:wikiPageID
| |
dbo:wikiPageLength
|
- 2441 (xsd:nonNegativeInteger)
|
dbo:wikiPageRevisionID
| |
dbo:wikiPageWikiLink
| |
dbp:j
|
- hoi2 pong4 dung1 tin4 hoi2 gai3 waak6 (en)
|
dbp:p
|
- Hǎipángdōng Tiánhǎi Jìhuà (en)
|
dbp:s
| |
dbp:t
| |
dbp:wikiPageUsesTemplate
| |
dcterms:subject
| |
gold:hypernym
| |
georss:point
| |
rdf:type
| |
rdfs:comment
|
- Beim Praya East Reclamation Project (chinesisch 海旁東填海計劃 / 海旁东填海计划, Pinyin Hǎipáng Dōng tiánhǎi jìhuà, Jyutping Hoi2pong4 Dung1 tin4hoi2 gai3waak6, englisch Praya East Reclamation Scheme) zur Landgewinnung in Hongkong betrieb die Sang Lee & Co. um 1921–1929 zwei Feldbahnen mit Spurweiten von 600 mm und 1067 mm (3½ Fuß). (de)
- Praya East Reclamation Scheme (Chinese: 海旁東填海計劃) was a large scale land reclamation project in Colonial Hong Kong lasting from 1921 to 1931 under Sir Catchick Paul Chater. (en)
- 海旁東填海計劃(Praya East Reclamation Scheme),又稱灣仔海旁填海計劃、東區海旁填海計劃,是香港20世紀初的一項主要填海工程。該工程於1921年開始,並於1931年全面完成,使香港島的下環得到大片填海土地。 (zh)
|
rdfs:label
|
- Praya East Reclamation Project (de)
- Praya East Reclamation Scheme (en)
- 海旁東填海計劃 (zh)
|
owl:sameAs
| |
geo:geometry
|
- POINT(114.18109893799 22.279399871826)
|
geo:lat
| |
geo:long
| |
prov:wasDerivedFrom
| |
foaf:depiction
| |
foaf:isPrimaryTopicOf
| |
is dbo:wikiPageWikiLink
of | |
is foaf:primaryTopic
of | |