Moorside nuclear power station is proposed for a site near Sellafield, in Cumbria, England. The original plan by NuGeneration, a British subsidiary of Toshiba-owned Westinghouse Electric Company, had the station coming online from 2024 with 3.4 GW of new nuclear capacity, from three AP1000 reactors. Work up to 2018 would include acquiring the site licence, the development consent order, and other required permits and permissions to start work. Site preparation was to take two years, up to 2020.

Property Value
dbo:abstract
  • Moorside nuclear power station is proposed for a site near Sellafield, in Cumbria, England. The original plan by NuGeneration, a British subsidiary of Toshiba-owned Westinghouse Electric Company, had the station coming online from 2024 with 3.4 GW of new nuclear capacity, from three AP1000 reactors. Work up to 2018 would include acquiring the site licence, the development consent order, and other required permits and permissions to start work. Site preparation was to take two years, up to 2020. Following the Chapter 11 bankruptcy of Westinghouse in March 2017, the project was put under review. From December 2017 to July 2018 Kepco was named as preferred bidder. Kepco were thought to prefer their own APR-1400 reactor design for the site, a design which had not yet gone through generic design assessment with the UK's Office for Nuclear Regulation. On 8 November 2018, it was announced that Toshiba's plans for the new nuclear power station had been scrapped and its subsidiary company, NuGen, would be wound up. The Moorside site was handed back to the Nuclear Decommissioning Authority, and the government issued a statement reaffirming its commitment to new nuclear. In July 2020, a EDF-led Moorside consortium announced a proposal for two EPR reactors yielding 3,200 MWe of new nuclear capacity. A second Rolls-Royce-led UK SMR consortium plans a low-carbon power station around a small light-water reactor and the possibility of a link with renewable technologies, storage systems and hydrogen production named Moorside clean energy hub. (en)
dbo:country
dbo:location
dbo:owner
dbo:status
  • cancelled
dbo:wikiPageID
  • 42649780 (xsd:integer)
dbo:wikiPageLength
  • 22425 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1122629296 (xsd:integer)
dbo:wikiPageWikiLink
dbp:country
dbp:location
dbp:name
  • Moorside nuclear power station (en)
dbp:npReactorType
  • PWR (en)
dbp:owner
dbp:status
  • cancelled (en)
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
georss:point
  • 54.4296 -3.5109
rdf:type
rdfs:comment
  • Moorside nuclear power station is proposed for a site near Sellafield, in Cumbria, England. The original plan by NuGeneration, a British subsidiary of Toshiba-owned Westinghouse Electric Company, had the station coming online from 2024 with 3.4 GW of new nuclear capacity, from three AP1000 reactors. Work up to 2018 would include acquiring the site licence, the development consent order, and other required permits and permissions to start work. Site preparation was to take two years, up to 2020. (en)
rdfs:label
  • Moorside nuclear power station (en)
rdfs:seeAlso
owl:sameAs
geo:geometry
  • POINT(-3.5109000205994 54.429599761963)
geo:lat
  • 54.429600 (xsd:float)
geo:long
  • -3.510900 (xsd:float)
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
foaf:name
  • Moorside nuclear power station (en)
is dbo:wikiPageDisambiguates of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is rdfs:seeAlso of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License