An Entity of Type: Thing, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The locomotives of the Dundalk, Newry and Greenore Railway were all 0-6-0ST (saddle tanks), with inside cylinders, to the designs of LNWR Chief Mechanical Engineer, John Ramsbottom, the first three locomotives being built by the LNWR Crewe Works, England, in 1873. Later, to work the extension of the line to Newry, two similar locos were built at Crewe in 1876. The sixth and final locomotive was added in 1898. The locomotives were consecutively numbered, in order of building, from 1 to 6 and also carried names (see table). Locomotive No.5 Carlingford was withdrawn in 1928 and scrapped.

Property Value
dbo:abstract
  • The locomotives of the Dundalk, Newry and Greenore Railway were all 0-6-0ST (saddle tanks), with inside cylinders, to the designs of LNWR Chief Mechanical Engineer, John Ramsbottom, the first three locomotives being built by the LNWR Crewe Works, England, in 1873. Later, to work the extension of the line to Newry, two similar locos were built at Crewe in 1876. The sixth and final locomotive was added in 1898. The locomotives were consecutively numbered, in order of building, from 1 to 6 and also carried names (see table). Locomotive No.5 Carlingford was withdrawn in 1928 and scrapped. During World War II three of the remaining 5 locomotives were loaned to the L.M.S. Northern Counties Committee for shunting duties around York Road, Belfast but were returned due to not being satisfactory to NCC's needs. The line closed on 31 December 1951, and although the stock list showed 5 steam locomotives only one was serviceable, No. 2 Greenore. Also on the final stock list was a petrol railcar. No. 1 'Macrory' lay in store at Adelaide, Belfast for possible preservation but was scrapped. The remaining 4 locomotives 2 'Greenore', 3 'Dundalk', 4 'Newry' and 6 'Holyhead' were scrapped by Hammond Land Foundry in Sutton, Co. Dublin. (en)
dbo:thumbnail
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 4510277 (xsd:integer)
dbo:wikiPageLength
  • 3518 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1082192328 (xsd:integer)
dbo:wikiPageWikiLink
dbp:wikiPageUsesTemplate
dcterms:subject
rdfs:comment
  • The locomotives of the Dundalk, Newry and Greenore Railway were all 0-6-0ST (saddle tanks), with inside cylinders, to the designs of LNWR Chief Mechanical Engineer, John Ramsbottom, the first three locomotives being built by the LNWR Crewe Works, England, in 1873. Later, to work the extension of the line to Newry, two similar locos were built at Crewe in 1876. The sixth and final locomotive was added in 1898. The locomotives were consecutively numbered, in order of building, from 1 to 6 and also carried names (see table). Locomotive No.5 Carlingford was withdrawn in 1928 and scrapped. (en)
rdfs:label
  • Locomotives of the Dundalk, Newry and Greenore Railway (en)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License