An Entity of Type: Rapid transit, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Line S3 of the Nanjing Metro (Chinese: 南京地铁S3号线; pinyin: Nánjīng Dìtiě S-Sān Hào Xiàn), is a north-south suburban rapid transit line serving part of the southern and southwestern suburbs of Nanjing, running from Nanjing South Railway Station and Gaojiachong. It is the first line of the Nanjing Metro with passing tracks at select stations, allowing from distinct express local services. The first phase of the project is 36.22 km (22.51 mi) long with 19 stations, including 10 underground stations, 8 elevated stations and 1 ground station. The line crosses the Yangtze River using the Dashengguan Yangtze River Bridge. In 2012, the first phase of the project was approved by the NDRC for construction with the first section started construction on 27 December 2012. On August 13, 2017, the first ph

Property Value
dbo:abstract
  • Line S3 of the Nanjing Metro (Chinese: 南京地铁S3号线; pinyin: Nánjīng Dìtiě S-Sān Hào Xiàn), is a north-south suburban rapid transit line serving part of the southern and southwestern suburbs of Nanjing, running from Nanjing South Railway Station and Gaojiachong. It is the first line of the Nanjing Metro with passing tracks at select stations, allowing from distinct express local services. The first phase of the project is 36.22 km (22.51 mi) long with 19 stations, including 10 underground stations, 8 elevated stations and 1 ground station. The line crosses the Yangtze River using the Dashengguan Yangtze River Bridge. In 2012, the first phase of the project was approved by the NDRC for construction with the first section started construction on 27 December 2012. On August 13, 2017, the first phase of Line S3 started to be unmanned testing. The first phase of the line was completed by the end of 2017 and started trial operation on 6 December 2017. (en)
  • La ligne S3 du métro de Nankin(chinois traditionnel : 寧和城際軌道交通 ; chinois simplifié : 宁和城际轨道交通) est la huitième ligne du métro de Nankin. C'est une ligne est nord-ouest sud qui relie le district de Yuhuatai avec le district de Pukou à l'ouest sud, elle est inaugurée le 6 décembre 2017. De Gare de Nankin-Sud à , la ligne comporte 19 stations et 36,26 km en longueur. (fr)
  • Jalur S3 dari Nanjing Metro, juga terkadang disebut jalur antarkota Nanjing–Kabupaten He atau jalur kereta api antarkota Ninghe, adalah sebuah jalur angkutan cepat subperkotaan yang melayani subperkotaan timur Nanjing, Jiangsu, China. Jalur tersebut adalah Nanjing Metro pertama dengan petak jalan di stasiun-stasiun terpilih, membolehkannya memberikan layanan lokal ekspres khusus. Fase pertama proyek tersebut memiliki panjang 36.22 kilometer dengan 19 stasiun, termasuk 10 stasiun atas tanah dan 1 stasiun bawah tanah. (in)
  • 寧和城際軌道交通(ねいわじょうさいきどうこうつう、中文表記: 宁和城际轨道交通、英文表記: Nanjing–Hexian Intercity Railway)は、中華人民共和国江蘇省南京市雨花台区の南京南駅から浦口区の、将来、東は紫東エリアのまで、西は安徽省和県まで延伸する南京地下鉄の路線である。 (ja)
  • 南京地铁S3号线又称宁和城际轨道交通,南京至和县市域铁路,是连接江苏省南京市和安徽省马鞍山市的快速轨道交通,是属于江苏省沿江城市群城际轨道交通网的南京都市圈轨道交通网的重要线路。一期工程全部在南京市域内,是南京地铁线网的市域快线,编号为S3号线(规划时曾命名为南京地铁12号线)。一期工程线路全长36.22公里,设19座车站。线路东起位于雨花台区的南京南站,经大胜关长江大桥过江,西至江北浦口区桥林的高家冲站。一期工程于2017年12月6日正式开通运营。二期工程于2021年6月列入长江三角洲地区多层次轨道交通规划远期布局项目。 (zh)
dbo:isPartOf
dbo:lineLength
  • 36260.000000 (xsd:double)
dbo:location
dbo:numberOfStations
  • 19 (xsd:nonNegativeInteger)
dbo:openingDate
  • 2017-12-06 (xsd:date)
dbo:openingYear
  • 2017-01-01 (xsd:gYear)
dbo:status
  • In operation
dbo:thumbnail
dbo:type
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 56008495 (xsd:integer)
dbo:wikiPageLength
  • 7324 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1106823228 (xsd:integer)
dbo:wikiPageWikiLink
dbp:character
  • Underground and Elevated (en)
dbp:imageWidth
  • 265 (xsd:integer)
dbp:locale
dbp:mapState
  • collapsed (en)
dbp:open
  • 2017-12-06 (xsd:date)
dbp:otherName
  • Nanjing–He County intercity railway (en)
  • Ninghe intercity railway (en)
dbp:p
  • Nánjīng Dìtiě S-Sān Hào Xiàn (en)
dbp:s
  • 南京地铁S3号线 (en)
dbp:stations
  • 19 (xsd:integer)
dbp:status
  • In operation (en)
dbp:system
dbp:tracks
  • 2 (xsd:integer)
dbp:type
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • La ligne S3 du métro de Nankin(chinois traditionnel : 寧和城際軌道交通 ; chinois simplifié : 宁和城际轨道交通) est la huitième ligne du métro de Nankin. C'est une ligne est nord-ouest sud qui relie le district de Yuhuatai avec le district de Pukou à l'ouest sud, elle est inaugurée le 6 décembre 2017. De Gare de Nankin-Sud à , la ligne comporte 19 stations et 36,26 km en longueur. (fr)
  • Jalur S3 dari Nanjing Metro, juga terkadang disebut jalur antarkota Nanjing–Kabupaten He atau jalur kereta api antarkota Ninghe, adalah sebuah jalur angkutan cepat subperkotaan yang melayani subperkotaan timur Nanjing, Jiangsu, China. Jalur tersebut adalah Nanjing Metro pertama dengan petak jalan di stasiun-stasiun terpilih, membolehkannya memberikan layanan lokal ekspres khusus. Fase pertama proyek tersebut memiliki panjang 36.22 kilometer dengan 19 stasiun, termasuk 10 stasiun atas tanah dan 1 stasiun bawah tanah. (in)
  • 寧和城際軌道交通(ねいわじょうさいきどうこうつう、中文表記: 宁和城际轨道交通、英文表記: Nanjing–Hexian Intercity Railway)は、中華人民共和国江蘇省南京市雨花台区の南京南駅から浦口区の、将来、東は紫東エリアのまで、西は安徽省和県まで延伸する南京地下鉄の路線である。 (ja)
  • 南京地铁S3号线又称宁和城际轨道交通,南京至和县市域铁路,是连接江苏省南京市和安徽省马鞍山市的快速轨道交通,是属于江苏省沿江城市群城际轨道交通网的南京都市圈轨道交通网的重要线路。一期工程全部在南京市域内,是南京地铁线网的市域快线,编号为S3号线(规划时曾命名为南京地铁12号线)。一期工程线路全长36.22公里,设19座车站。线路东起位于雨花台区的南京南站,经大胜关长江大桥过江,西至江北浦口区桥林的高家冲站。一期工程于2017年12月6日正式开通运营。二期工程于2021年6月列入长江三角洲地区多层次轨道交通规划远期布局项目。 (zh)
  • Line S3 of the Nanjing Metro (Chinese: 南京地铁S3号线; pinyin: Nánjīng Dìtiě S-Sān Hào Xiàn), is a north-south suburban rapid transit line serving part of the southern and southwestern suburbs of Nanjing, running from Nanjing South Railway Station and Gaojiachong. It is the first line of the Nanjing Metro with passing tracks at select stations, allowing from distinct express local services. The first phase of the project is 36.22 km (22.51 mi) long with 19 stations, including 10 underground stations, 8 elevated stations and 1 ground station. The line crosses the Yangtze River using the Dashengguan Yangtze River Bridge. In 2012, the first phase of the project was approved by the NDRC for construction with the first section started construction on 27 December 2012. On August 13, 2017, the first ph (en)
rdfs:label
  • Jalur S3 (Nanjing Metro) (in)
  • Ligne S3 du métro de Nankin (fr)
  • Line S3 (Nanjing Metro) (en)
  • 寧和城際軌道交通 (ja)
  • 南京地铁S3号线 (zh)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:homepage
foaf:isPrimaryTopicOf
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License