The Green Line Extension (GLX) is a construction project to extend the light rail Massachusetts Bay Transportation Authority (MBTA) Green Line northwest into Somerville and Medford, two inner suburbs of Boston, Massachusetts. The project is opening in two phases in 2022 at a total cost of $2.28 billion. Total ridership on the 4.3-mile (6.9 km) extension is estimated to reach 45,000 one-way trips per day in 2030.

Property Value
dbo:abstract
  • The Green Line Extension (GLX) is a construction project to extend the light rail Massachusetts Bay Transportation Authority (MBTA) Green Line northwest into Somerville and Medford, two inner suburbs of Boston, Massachusetts. The project is opening in two phases in 2022 at a total cost of $2.28 billion. Total ridership on the 4.3-mile (6.9 km) extension is estimated to reach 45,000 one-way trips per day in 2030. The project begins at the north end of the Lechmere Viaduct, where the former ground-level Lechmere station was replaced by an elevated station on an extended viaduct. The two branches split north of Lechmere, with the Union Square Branch following the MBTA Commuter Rail Fitchburg Line right of way to Union Square station in Somerville. The Medford Branch follows the Lowell Line right-of-way to Medford/Tufts station with four intermediate stations. A new vehicle maintenance facility and storage yard is located in the Inner Belt District. An extension of service beyond Lechmere was considered as early as 1922, with the first formal proposal in 1926. Despite appearing in other regional plans throughout the 20th century, the state did not commit to the project until 1990. Planning began in 2006 with a projected completion date of 2014; this was delayed to 2015, then to 2018. A groundbreaking was held in 2012, with several early construction elements over the next two years. The federal government committed $996 million of the $2.2 billion cost in 2014. In 2015, with projected costs increased to $3.3 billion, the project was placed on hold. A revised plan, with more modest stations and other value engineering, was submitted in 2016 and approved in 2017. The main $1.08 billion design-build contract was issued in November 2017, with several optional items like platform canopies and a larger vehicle maintenance facility included. Construction began in 2018, with the old Lechmere station closed in May 2020. The new Lechmere station and Union Square Branch opened on March 21, 2022, while the Medford Branch is scheduled to open on December 12, 2022. (en)
dbo:isPartOf
dbo:lineLength
  • 6920.179200 (xsd:double)
dbo:location
dbo:numberOfStations
  • 2 (xsd:nonNegativeInteger)
dbo:openingDate
  • 2022-03-21 (xsd:date)
dbo:openingYear
  • 2022-01-01 (xsd:gYear)
dbo:owner
dbo:routeEnd
dbo:routeStart
dbo:speedLimit
  • 80.467000 (xsd:double)
dbo:status
  • One branch open, one under construction
dbo:thumbnail
dbo:type
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 22785607 (xsd:integer)
dbo:wikiPageLength
  • 119646 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1122807827 (xsd:integer)
dbo:wikiPageWikiLink
dbp:alt
  • See caption. (en)
dbp:author
  • Mike Capuano, US Representative and former Somerville mayor, on the 2018 groundbreaking (en)
dbp:caption
  • Map showing the 1926-proposed extensions northwest from Lechmere (en)
  • Map showing the 1966-proposed extensions northwest from Lechmere (en)
  • A test train on the Red Bridge viaduct in January 2022 (en)
dbp:float
  • right (en)
dbp:height
  • 180 (xsd:integer)
  • 220 (xsd:integer)
dbp:imageAlt
  • A light rail train on the ramp to a viaduct in an urban area (en)
dbp:imageLeft
  • -70 (xsd:integer)
  • 0 (xsd:integer)
dbp:imageTop
  • -230 (xsd:integer)
  • 0 (xsd:integer)
dbp:imageWidth
  • 250 (xsd:integer)
  • 300 (xsd:integer)
  • 320 (xsd:integer)
dbp:locale
  • Cambridge, Somerville, and Medford, Massachusetts (en)
dbp:name
  • Green Line Extension (en)
dbp:open
  • 2022-03-21 (xsd:date)
dbp:owner
dbp:planopen
  • 2022-12-12 (xsd:date)
dbp:quote
  • I swore publicly that I would never come to another groundbreaking of the Green Line because I had already been to three. Today is different because this one is real. It’s been a long time coming. (en)
dbp:stations
  • 2 (xsd:integer)
dbp:status
  • One branch open, one under construction (en)
dbp:system
  • Green Line (en)
dbp:tracks
  • 2 (xsd:integer)
dbp:type
dbp:width
  • 250 (xsd:integer)
  • 300 (xsd:integer)
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
rdf:type
rdfs:comment
  • The Green Line Extension (GLX) is a construction project to extend the light rail Massachusetts Bay Transportation Authority (MBTA) Green Line northwest into Somerville and Medford, two inner suburbs of Boston, Massachusetts. The project is opening in two phases in 2022 at a total cost of $2.28 billion. Total ridership on the 4.3-mile (6.9 km) extension is estimated to reach 45,000 one-way trips per day in 2030. (en)
rdfs:label
  • Green Line Extension (en)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Green Line Extension (GLX) (en)
is dbo:servingRailwayLine of
is dbo:wikiPageDisambiguates of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is dbp:line of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License