Euston tunnel is a tunnel currently planned in London that will carry the High Speed 2 (HS2) railway between Euston railway station and Old Oak Common railway station. Work to prepare the site for construction was undertaken in the late 2010s, such as the clearance of the old carriage sheds near Euston station in 2018. A legal challenge to the tunnel's design was defeated in mid-2020. During October 2020, HS2 Ltd ordered the two tunnel boring machines (TBMs) from Herrenknecht that will excavate the tunnel. Excavation is scheduled to take place between 2022 and 2024.
Property | Value |
---|---|
dbo:Infrastructure/length |
|
dbo:abstract |
|
dbo:length |
|
dbo:numberOfTracks |
|
dbo:routeEndLocation | |
dbo:routeStartLocation | |
dbo:status |
|
dbo:thumbnail | |
dbo:width |
|
dbo:wikiPageID |
|
dbo:wikiPageLength |
|
dbo:wikiPageRevisionID |
|
dbo:wikiPageWikiLink |
|
dbp:caption |
|
dbp:crosses |
|
dbp:end | |
dbp:name |
|
dbp:notrack |
|
dbp:start | |
dbp:status |
|
dbp:system | |
dbp:traffic |
|
dbp:wikiPageUsesTemplate | |
dcterms:subject | |
georss:point |
|
rdf:type | |
rdfs:comment |
|
rdfs:label |
|
owl:sameAs | |
geo:geometry |
|
geo:lat |
|
geo:long |
|
prov:wasDerivedFrom | |
foaf:depiction | |
foaf:isPrimaryTopicOf | |
foaf:name |
|
is foaf:primaryTopic of |