About: Cibubur Line

An Entity of Type: Light rail, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The Jabodebek LRT Cibubur Line (Indonesian: LRT Jabodebek Lin Cibubur) is one of the two light rail line of the Greater Jakarta LRT which will connect to station, which is about 25.94 km in length. The line adopts elevated construction and stops at twelve stations. Its Pancoran–Harjamukti section runs along the Jakarta Inner Ring Road and Jagorawi Toll Road. The planned next phase would extend the line to Bogor.

Property Value
dbo:abstract
  • The Jabodebek LRT Cibubur Line (Indonesian: LRT Jabodebek Lin Cibubur) is one of the two light rail line of the Greater Jakarta LRT which will connect to station, which is about 25.94 km in length. The line adopts elevated construction and stops at twelve stations. Its Pancoran–Harjamukti section runs along the Jakarta Inner Ring Road and Jagorawi Toll Road. The planned next phase would extend the line to Bogor. (en)
  • LRT Lin Cibubur merupakan salah satu lintas pelayanan LRT Jabodebek yang menghubungkan Stasiun LRT Dukuh Atas dengan Stasiun Harjamukti. Lintas ini memiliki panjang 25,94 kilometer dan melayani 12 stasiun. Sebagian besar lintasan ini merupakan jalur layang dan rencananya akan dioperasikan pada Juni 2023. Jalur ini akan dioperasikan oleh PT Kereta Api Indonesia. (in)
dbo:isPartOf
dbo:lineLength
  • 25940.000000 (xsd:double)
dbo:location
dbo:numberOfStations
  • 12 (xsd:nonNegativeInteger)
dbo:operator
dbo:owner
dbo:status
  • Under construction
dbo:thumbnail
dbo:type
dbo:wikiPageID
  • 63738006 (xsd:integer)
dbo:wikiPageLength
  • 7124 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1121789251 (xsd:integer)
dbo:wikiPageWikiLink
dbp:boxWidth
  • 250 (xsd:integer)
dbp:caption
  • Trial run at Harjamukti Station (en)
dbp:character
  • Elevated (en)
dbp:color
  • 20409.0
dbp:depot
  • Harjamukti (en)
dbp:electrification
  • 750 (xsd:integer)
dbp:locale
dbp:mapState
  • collapsed (en)
dbp:name
  • Cibubur Line (en)
dbp:nativeName
  • Lintas pelayanan 1 LRT Jabodebek (en)
dbp:nativeNameLang
  • id (en)
dbp:operator
dbp:otherName
  • Dukuh Atas–Cibubur LRT (en)
dbp:owner
dbp:planopen
  • 2022 (xsd:integer)
dbp:routes
  • 1 (xsd:integer)
dbp:stations
  • 12 (xsd:integer)
dbp:status
  • Under construction (en)
dbp:system
dbp:tracks
  • 2 (xsd:integer)
dbp:type
dbp:wikiPageUsesTemplate
dbp:yearcompleted
  • 2022 (xsd:integer)
dcterms:subject
rdf:type
rdfs:comment
  • The Jabodebek LRT Cibubur Line (Indonesian: LRT Jabodebek Lin Cibubur) is one of the two light rail line of the Greater Jakarta LRT which will connect to station, which is about 25.94 km in length. The line adopts elevated construction and stops at twelve stations. Its Pancoran–Harjamukti section runs along the Jakarta Inner Ring Road and Jagorawi Toll Road. The planned next phase would extend the line to Bogor. (en)
  • LRT Lin Cibubur merupakan salah satu lintas pelayanan LRT Jabodebek yang menghubungkan Stasiun LRT Dukuh Atas dengan Stasiun Harjamukti. Lintas ini memiliki panjang 25,94 kilometer dan melayani 12 stasiun. Sebagian besar lintasan ini merupakan jalur layang dan rencananya akan dioperasikan pada Juni 2023. Jalur ini akan dioperasikan oleh PT Kereta Api Indonesia. (in)
rdfs:label
  • Cibubur Line (en)
  • Lin Cibubur (LRT Jabodebek) (in)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Cibubur Line (en)
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License