| dbp:reason
|
- Since the "Squadron Operations Center" is listed separately on p. 2.3, what was controlled by the "Control Room"? Perhaps the page 6.13 diagram considers the "IMSSCE" & "Wire Launch" equipment to be in a separate room from the IMSOC, despite all being shown within the same room walls? (en)
|