dbo:abstract
|
- The Red Line (Line 1) (Hindi: रेड लाइन) of the Lucknow Metro is a metro route of mass rapid transit system in Lucknow. It consists of 21 metro stations from CCS International Airport to Munshi Pulia with a total distance of 22.87 km. It is also known as the North-South corridor of Lucknow. The Lucknow metro train consists of four coaches, and they have a maximum speed of 90 km/h. Most of the lines are elevated. (en)
|
dbo:elevation
| |
dbo:isPartOf
| |
dbo:lineLength
|
- 22878.000000 (xsd:double)
|
dbo:location
| |
dbo:numberOfStations
|
- 21 (xsd:nonNegativeInteger)
|
dbo:openingDate
| |
dbo:openingYear
| |
dbo:operator
| |
dbo:railwayRollingStock
| |
dbo:status
| |
dbo:type
| |
dbo:wikiPageID
| |
dbo:wikiPageLength
|
- 8420 (xsd:nonNegativeInteger)
|
dbo:wikiPageRevisionID
| |
dbo:wikiPageWikiLink
| |
dbp:character
|
- Underground & Elevated (en)
|
dbp:electrification
| |
dbp:elevation
| |
dbp:locale
| |
dbp:mapState
| |
dbp:name
|
- Red Line (en)
- रेड लाइन (en)
|
dbp:open
| |
dbp:operator
| |
dbp:stations
| |
dbp:status
| |
dbp:stock
| |
dbp:system
| |
dbp:type
| |
dbp:wikiPageUsesTemplate
| |
dcterms:subject
| |
rdf:type
| |
rdfs:comment
|
- The Red Line (Line 1) (Hindi: रेड लाइन) of the Lucknow Metro is a metro route of mass rapid transit system in Lucknow. It consists of 21 metro stations from CCS International Airport to Munshi Pulia with a total distance of 22.87 km. It is also known as the North-South corridor of Lucknow. The Lucknow metro train consists of four coaches, and they have a maximum speed of 90 km/h. Most of the lines are elevated. (en)
|
rdfs:label
|
- Red Line (Lucknow Metro) (en)
|
owl:sameAs
| |
prov:wasDerivedFrom
| |
foaf:homepage
| |
foaf:isPrimaryTopicOf
| |
foaf:name
|
- Red Line (en)
- रेड लाइन (en)
|
is dbo:wikiPageDisambiguates
of | |
is dbo:wikiPageRedirects
of | |
is dbo:wikiPageWikiLink
of | |
is foaf:primaryTopic
of | |