An Entity of Type: Rapid Transit, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The Red Line or Line 5 is one of the three lines of Chennai Metro, Phase 2 Project. The under construction line stretches from to . The line will consist of 48 stations, out of which 6 are underground, 1 at grade and 41 are elevated. The government has announced feasibility studies to extend metro rail's corridor-5 from Thirumangalam to Avadi via Mogappair and Ambattur. At present, the proposed corridor-5 links Madhavaram with Sholinganallur via Koyambedu, Alandur and Madipakkam.

Property Value
dbo:abstract
  • The Red Line or Line 5 is one of the three lines of Chennai Metro, Phase 2 Project. The under construction line stretches from to . The line will consist of 48 stations, out of which 6 are underground, 1 at grade and 41 are elevated. The government has announced feasibility studies to extend metro rail's corridor-5 from Thirumangalam to Avadi via Mogappair and Ambattur. At present, the proposed corridor-5 links Madhavaram with Sholinganallur via Koyambedu, Alandur and Madipakkam. (en)
dbo:isPartOf
dbo:lineLength
  • 47000.000000 (xsd:double)
dbo:numberOfStations
  • 49 (xsd:nonNegativeInteger)
dbo:operator
dbo:owner
dbo:status
  • Under Construction
dbo:type
dbo:wikiPageID
  • 67929786 (xsd:integer)
dbo:wikiPageLength
  • 16781 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1124330718 (xsd:integer)
dbo:wikiPageWikiLink
dbp:character
  • 5.800000 (xsd:double)
dbp:color
  • ff0000 (en)
dbp:electrification
  • 25 (xsd:integer)
dbp:name
  • Line 5 (en)
dbp:nativeNameLang
  • ta (en)
dbp:operator
dbp:owner
dbp:speed
  • 80 (xsd:integer)
dbp:stations
  • 49 (xsd:integer)
dbp:status
  • Under Construction (en)
dbp:system
dbp:tracks
  • 2 (xsd:integer)
dbp:type
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • The Red Line or Line 5 is one of the three lines of Chennai Metro, Phase 2 Project. The under construction line stretches from to . The line will consist of 48 stations, out of which 6 are underground, 1 at grade and 41 are elevated. The government has announced feasibility studies to extend metro rail's corridor-5 from Thirumangalam to Avadi via Mogappair and Ambattur. At present, the proposed corridor-5 links Madhavaram with Sholinganallur via Koyambedu, Alandur and Madipakkam. (en)
rdfs:label
  • Line 5 (Chennai Metro) (en)
owl:sameAs
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
foaf:name
  • Line 5 (Red Line) (en)
is dbo:wikiPageDisambiguates of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License