The Red Line or Line 5 is one of the three lines of Chennai Metro, Phase 2 Project. The under construction line stretches from to . The line will consist of 48 stations, out of which 6 are underground, 1 at grade and 41 are elevated. The government has announced feasibility studies to extend metro rail's corridor-5 from Thirumangalam to Avadi via Mogappair and Ambattur. At present, the proposed corridor-5 links Madhavaram with Sholinganallur via Koyambedu, Alandur and Madipakkam.
Property | Value |
---|---|
dbo:abstract |
|
dbo:isPartOf | |
dbo:lineLength |
|
dbo:numberOfStations |
|
dbo:operator | |
dbo:owner | |
dbo:status |
|
dbo:type | |
dbo:wikiPageID |
|
dbo:wikiPageLength |
|
dbo:wikiPageRevisionID |
|
dbo:wikiPageWikiLink |
|
dbp:character |
|
dbp:color |
|
dbp:electrification |
|
dbp:name |
|
dbp:nativeNameLang |
|
dbp:operator | |
dbp:owner | |
dbp:speed |
|
dbp:stations |
|
dbp:status |
|
dbp:system | |
dbp:tracks |
|
dbp:type | |
dbp:wikiPageUsesTemplate | |
dcterms:subject | |
rdf:type | |
rdfs:comment |
|
rdfs:label |
|
owl:sameAs | |
prov:wasDerivedFrom | |
foaf:isPrimaryTopicOf | |
foaf:name |
|
is dbo:wikiPageDisambiguates of | |
is dbo:wikiPageWikiLink of |
|
is foaf:primaryTopic of |