About: Kanaka Bridge

An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The Kanaka Bridge, is an under construction 2 lane bridge over the Kanaka river (near Mantam lake) at Dzongu village in the Mangan subdivision of Sikkim state in India. Kanaka Bridge is a two-lane steel bridge likely to be completed in 2021. The bridge is Under the Road and Bridge Department, Government of Sikkim. The Construction is awarded to Siliguri-based company at the cost of INR 88.5cr. The bridge will be joining the 13 villages and better connectively for Indian army.The bridge runs over river Rongyong damming which Mantam lake was created. The side of the lake is a vast pebbly area where people usually do camp or picnic. The dust created from the pebbles due to weathering of the river is used as sand here. At the end of the bridge there is a village named Kiem and from there if y

Property Value
dbo:Infrastructure/length
  • 0.255
dbo:abstract
  • The Kanaka Bridge, is an under construction 2 lane bridge over the Kanaka river (near Mantam lake) at Dzongu village in the Mangan subdivision of Sikkim state in India. Kanaka Bridge is a two-lane steel bridge likely to be completed in 2021. The bridge is Under the Road and Bridge Department, Government of Sikkim. The Construction is awarded to Siliguri-based company at the cost of INR 88.5cr. The bridge will be joining the 13 villages and better connectively for Indian army.The bridge runs over river Rongyong damming which Mantam lake was created. The side of the lake is a vast pebbly area where people usually do camp or picnic. The dust created from the pebbles due to weathering of the river is used as sand here. At the end of the bridge there is a village named Kiem and from there if you walk for 3/4 km there is Lingdem Hotspring. (en)
dbo:bridgeCarries
  • 2 Lanes pedestrians and vehicles
dbo:height
  • 160.000000 (xsd:double)
dbo:length
  • 255.000000 (xsd:double)
dbo:locatedInArea
dbo:mainspan
  • 217.000000 (xsd:double)
dbo:thumbnail
dbo:wikiPageID
  • 65439774 (xsd:integer)
dbo:wikiPageLength
  • 3975 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1120501461 (xsd:integer)
dbo:wikiPageWikiLink
dbp:bridgeName
  • Kanaka Bridge (en)
dbp:caption
  • Kanaka Bridge Under-construction, Sikkim (en)
dbp:carries
  • 2 (xsd:integer)
dbp:crosses
  • Kanaka River (en)
dbp:design
  • Arch Bridge (en)
dbp:locale
  • Managan district of Sikkim (en)
dbp:material
  • Steel and Concrete (en)
dbp:wikiPageUsesTemplate
dcterms:subject
georss:point
  • 27.539123 88.484037
rdf:type
rdfs:comment
  • The Kanaka Bridge, is an under construction 2 lane bridge over the Kanaka river (near Mantam lake) at Dzongu village in the Mangan subdivision of Sikkim state in India. Kanaka Bridge is a two-lane steel bridge likely to be completed in 2021. The bridge is Under the Road and Bridge Department, Government of Sikkim. The Construction is awarded to Siliguri-based company at the cost of INR 88.5cr. The bridge will be joining the 13 villages and better connectively for Indian army.The bridge runs over river Rongyong damming which Mantam lake was created. The side of the lake is a vast pebbly area where people usually do camp or picnic. The dust created from the pebbles due to weathering of the river is used as sand here. At the end of the bridge there is a village named Kiem and from there if y (en)
rdfs:label
  • Kanaka Bridge (en)
owl:sameAs
geo:geometry
  • POINT(88.484039306641 27.539123535156)
geo:lat
  • 27.539124 (xsd:float)
geo:long
  • 88.484039 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Kanaka Bridge (en)
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License