About: Seyrantepe Dam     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:ArchitecturalStructure, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FSeyrantepe_Dam

The Seyrantepe Dam is an earth-fill embankment dam on the Peri River (a tributary of the Euphrates), located 15 km (9 mi) northwest of Karakoçan on the border of Elazığ and Tunceli Provinces, Turkey. Its primary purpose is hydroelectric power generation and is the fifth dam in the Peri River cascade. Construction on the dam began in 2003 and its power station was commissioned in 2008. It contains two 29.39 MW Francis turbine-generators for a total installed capacity of 58.78 MW. It is owned and operated by Limak Energy and Bilgin Energy. The sand and gravel-fill dam is 48.5 m (159 ft) tall.

AttributesValues
rdf:type
rdfs:label
  • Seyrantepe-Talsperre (de)
  • Seyrantepe Dam (en)
  • ГЕС Сейрантепе (uk)
rdfs:comment
  • Die Seyrantepe-Talsperre (türkisch Seyrantepe Barajı) befindet sich 15 km nordwestlich von Karakoçan an der Grenze der beiden türkischen Provinzen Elazığ und Tunceli am Fluss Peri Çayı. Die Seyrantepe-Talsperre wurde 2008 fertiggestellt. Das Absperrbauwerk ist ein Sand-Kies-Schüttdamm mit Lehmkern.Die Talsperre wurde zum Zwecke der Energieerzeugung errichtet.Der Staudamm hat eine Höhe von 31 m und besitzt ein Volumen von 1,22 Mio. m³. Die Talsperre besitzt ein Speichervolumen von 23,35 Mio. m³. Das Wasserkraftwerk der Seyrantepe-Talsperre verfügt über 2 Francis-Turbinen zu 25,7 Megawatt. Das Regelarbeitsvermögen liegt bei 161 GWh im Jahr. Flussaufwärts befindet sich die Özlüce-Talsperre. (de)
  • The Seyrantepe Dam is an earth-fill embankment dam on the Peri River (a tributary of the Euphrates), located 15 km (9 mi) northwest of Karakoçan on the border of Elazığ and Tunceli Provinces, Turkey. Its primary purpose is hydroelectric power generation and is the fifth dam in the Peri River cascade. Construction on the dam began in 2003 and its power station was commissioned in 2008. It contains two 29.39 MW Francis turbine-generators for a total installed capacity of 58.78 MW. It is owned and operated by Limak Energy and Bilgin Energy. The sand and gravel-fill dam is 48.5 m (159 ft) tall. (en)
  • ГЕС Сейрантепе (тур. Seyrantepe Barajı) – гідроелектростанція на південному сході Туреччини. Знаходячись між ГЕС Пембелік (вище по течії) та ГЕС Татар, входить до складу каскаду на річці Peri Suyu Çayı, лівій притоці Мунзур-Чай, котра в свою чергу є правою притокою Мурату (лівий витік Євфрату). В межах проекту річку перекрили греблею висотою 36 метрів, яка включає кам'яно-накидну ділянку із глиняним ядром та секцію бетонних водоскидів. Вона утримує водосховище з об’ємом 23,5 млн м3. Видача продукції відбувається по ЛЕП, розрахованій на роботу під напругою 154 кВ. (uk)
foaf:name
  • Seyrantepe Dam (en)
name
  • Seyrantepe Dam (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/SeyrantepeDam-July2012-01.jpg
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
thumbnail
country
  • Turkey (en)
image caption
  • Aerial photo of the dam and its power station (en)
location
  • Karakoçan on the border of Elazığ and Tunceli Province (en)
location map
  • Turkey (en)
purpose
  • Power, regulation (en)
status
  • O (en)
georss:point
  • 39.02102222222222 39.89163055555556
has abstract
  • Die Seyrantepe-Talsperre (türkisch Seyrantepe Barajı) befindet sich 15 km nordwestlich von Karakoçan an der Grenze der beiden türkischen Provinzen Elazığ und Tunceli am Fluss Peri Çayı. Die Seyrantepe-Talsperre wurde 2008 fertiggestellt. Das Absperrbauwerk ist ein Sand-Kies-Schüttdamm mit Lehmkern.Die Talsperre wurde zum Zwecke der Energieerzeugung errichtet.Der Staudamm hat eine Höhe von 31 m und besitzt ein Volumen von 1,22 Mio. m³. Die Talsperre besitzt ein Speichervolumen von 23,35 Mio. m³. Das Wasserkraftwerk der Seyrantepe-Talsperre verfügt über 2 Francis-Turbinen zu 25,7 Megawatt. Das Regelarbeitsvermögen liegt bei 161 GWh im Jahr. Flussaufwärts befindet sich die Özlüce-Talsperre. (de)
  • The Seyrantepe Dam is an earth-fill embankment dam on the Peri River (a tributary of the Euphrates), located 15 km (9 mi) northwest of Karakoçan on the border of Elazığ and Tunceli Provinces, Turkey. Its primary purpose is hydroelectric power generation and is the fifth dam in the Peri River cascade. Construction on the dam began in 2003 and its power station was commissioned in 2008. It contains two 29.39 MW Francis turbine-generators for a total installed capacity of 58.78 MW. It is owned and operated by Limak Energy and Bilgin Energy. The sand and gravel-fill dam is 48.5 m (159 ft) tall. At the opening of the hydro plant, President (then-Prime Minister) Recep Tayyip Erdoğan used the opportunity to attack environmentalist critics, a campaign he sustained in office: he said "While making these investments we are also taking the natural life into consideration. We know that most of the [environmentalist] criticisms in the media in this regard are ideological. On the other hand, we are already taking reasonable and sincere criticisms into account and we are examining them. Just like in the case where we consider the balance between democracy and security, we are continuing our balanced approach between development and environment. No one shall have any doubts on this. But we should not forget; while preaching environment, we should not forget to say that humans come first. Because humans come before anything else. The living conditions of our people are very crucial for us." Speech during the opening ceremony of the Seyrantepe Hydroelectricity Plant, Peri Suyu (en)
  • ГЕС Сейрантепе (тур. Seyrantepe Barajı) – гідроелектростанція на південному сході Туреччини. Знаходячись між ГЕС Пембелік (вище по течії) та ГЕС Татар, входить до складу каскаду на річці Peri Suyu Çayı, лівій притоці Мунзур-Чай, котра в свою чергу є правою притокою Мурату (лівий витік Євфрату). В межах проекту річку перекрили греблею висотою 36 метрів, яка включає кам'яно-накидну ділянку із глиняним ядром та секцію бетонних водоскидів. Вона утримує водосховище з об’ємом 23,5 млн м3. Біля лівого берегу облаштовано пригреблевий машинний зал, де встановили дві турбіни типу Френсіс потужністю по 28 МВт, які при чистому напорі у 32,5 метра повинні забезпечувати виробництво 207 млн кВт-год електроенергії на рік. Видача продукції відбувається по ЛЕП, розрахованій на роботу під напругою 154 кВ. (uk)
construction began
dam crosses
  • Peri River (en)
dam type
  • Embankment, sand and gravel-fill (en)
plant annual gen
plant capacity
plant commission
  • September 2008 (en)
plant operator
  • Limak Energy and Bilgin Energy (en)
plant turbines
plant type
  • Conventional (en)
part
river
gold:hypernym
building start year
prov:wasDerivedFrom
page length (characters) of wiki page
building start date
  • 2003
description
  • Embankment, sand and gravel-fill (en)
opening year
purpose
  • Power, regulation
status
  • O
country
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(39.891632080078 39.021022796631)
is Link from a Wikipage to another Wikipage of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (61 GB total memory, 46 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software