An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The Seyrantepe Dam is an earth-fill embankment dam on the Peri River (a tributary of the Euphrates), located 15 km (9 mi) northwest of Karakoçan on the border of Elazığ and Tunceli Provinces, Turkey. Its primary purpose is hydroelectric power generation and is the fifth dam in the Peri River cascade. Construction on the dam began in 2003 and its power station was commissioned in 2008. It contains two 29.39 MW Francis turbine-generators for a total installed capacity of 58.78 MW. It is owned and operated by Limak Energy and Bilgin Energy. The sand and gravel-fill dam is 48.5 m (159 ft) tall.

Property Value
dbo:abstract
  • Die Seyrantepe-Talsperre (türkisch Seyrantepe Barajı) befindet sich 15 km nordwestlich von Karakoçan an der Grenze der beiden türkischen Provinzen Elazığ und Tunceli am Fluss Peri Çayı. Die Seyrantepe-Talsperre wurde 2008 fertiggestellt. Das Absperrbauwerk ist ein Sand-Kies-Schüttdamm mit Lehmkern.Die Talsperre wurde zum Zwecke der Energieerzeugung errichtet.Der Staudamm hat eine Höhe von 31 m und besitzt ein Volumen von 1,22 Mio. m³. Die Talsperre besitzt ein Speichervolumen von 23,35 Mio. m³. Das Wasserkraftwerk der Seyrantepe-Talsperre verfügt über 2 Francis-Turbinen zu 25,7 Megawatt. Das Regelarbeitsvermögen liegt bei 161 GWh im Jahr. Flussaufwärts befindet sich die Özlüce-Talsperre. (de)
  • The Seyrantepe Dam is an earth-fill embankment dam on the Peri River (a tributary of the Euphrates), located 15 km (9 mi) northwest of Karakoçan on the border of Elazığ and Tunceli Provinces, Turkey. Its primary purpose is hydroelectric power generation and is the fifth dam in the Peri River cascade. Construction on the dam began in 2003 and its power station was commissioned in 2008. It contains two 29.39 MW Francis turbine-generators for a total installed capacity of 58.78 MW. It is owned and operated by Limak Energy and Bilgin Energy. The sand and gravel-fill dam is 48.5 m (159 ft) tall. At the opening of the hydro plant, President (then-Prime Minister) Recep Tayyip Erdoğan used the opportunity to attack environmentalist critics, a campaign he sustained in office: he said "While making these investments we are also taking the natural life into consideration. We know that most of the [environmentalist] criticisms in the media in this regard are ideological. On the other hand, we are already taking reasonable and sincere criticisms into account and we are examining them. Just like in the case where we consider the balance between democracy and security, we are continuing our balanced approach between development and environment. No one shall have any doubts on this. But we should not forget; while preaching environment, we should not forget to say that humans come first. Because humans come before anything else. The living conditions of our people are very crucial for us." Speech during the opening ceremony of the Seyrantepe Hydroelectricity Plant, Peri Suyu (en)
  • ГЕС Сейрантепе (тур. Seyrantepe Barajı) – гідроелектростанція на південному сході Туреччини. Знаходячись між ГЕС Пембелік (вище по течії) та ГЕС Татар, входить до складу каскаду на річці Peri Suyu Çayı, лівій притоці Мунзур-Чай, котра в свою чергу є правою притокою Мурату (лівий витік Євфрату). В межах проекту річку перекрили греблею висотою 36 метрів, яка включає кам'яно-накидну ділянку із глиняним ядром та секцію бетонних водоскидів. Вона утримує водосховище з об’ємом 23,5 млн м3. Біля лівого берегу облаштовано пригреблевий машинний зал, де встановили дві турбіни типу Френсіс потужністю по 28 МВт, які при чистому напорі у 32,5 метра повинні забезпечувати виробництво 207 млн кВт-год електроенергії на рік. Видача продукції відбувається по ЛЕП, розрахованій на роботу під напругою 154 кВ. (uk)
dbo:buildingStartDate
  • 2003
dbo:buildingStartYear
  • 2003-01-01 (xsd:gYear)
dbo:country
dbo:description
  • Embankment, sand and gravel-fill (en)
dbo:location
dbo:openingYear
  • 2008-01-01 (xsd:gYear)
dbo:part
dbo:purpose
  • Power, regulation
dbo:river
dbo:status
  • O
dbo:thumbnail
dbo:wikiPageID
  • 47062784 (xsd:integer)
dbo:wikiPageLength
  • 4997 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1002377498 (xsd:integer)
dbo:wikiPageWikiLink
dbp:constructionBegan
  • 2003 (xsd:integer)
dbp:country
  • Turkey (en)
dbp:damCrosses
  • Peri River (en)
dbp:damType
  • Embankment, sand and gravel-fill (en)
dbp:imageCaption
  • Aerial photo of the dam and its power station (en)
dbp:location
  • Karakoçan on the border of Elazığ and Tunceli Province (en)
dbp:locationMap
  • Turkey (en)
dbp:name
  • Seyrantepe Dam (en)
dbp:plantAnnualGen
  • 180.0
dbp:plantCapacity
  • 58.78
dbp:plantCommission
  • September 2008 (en)
dbp:plantOperator
  • Limak Energy and Bilgin Energy (en)
dbp:plantTurbines
  • 2 (xsd:integer)
dbp:plantType
  • Conventional (en)
dbp:purpose
  • Power, regulation (en)
dbp:status
  • O (en)
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
georss:point
  • 39.02102222222222 39.89163055555556
rdf:type
rdfs:comment
  • Die Seyrantepe-Talsperre (türkisch Seyrantepe Barajı) befindet sich 15 km nordwestlich von Karakoçan an der Grenze der beiden türkischen Provinzen Elazığ und Tunceli am Fluss Peri Çayı. Die Seyrantepe-Talsperre wurde 2008 fertiggestellt. Das Absperrbauwerk ist ein Sand-Kies-Schüttdamm mit Lehmkern.Die Talsperre wurde zum Zwecke der Energieerzeugung errichtet.Der Staudamm hat eine Höhe von 31 m und besitzt ein Volumen von 1,22 Mio. m³. Die Talsperre besitzt ein Speichervolumen von 23,35 Mio. m³. Das Wasserkraftwerk der Seyrantepe-Talsperre verfügt über 2 Francis-Turbinen zu 25,7 Megawatt. Das Regelarbeitsvermögen liegt bei 161 GWh im Jahr. Flussaufwärts befindet sich die Özlüce-Talsperre. (de)
  • The Seyrantepe Dam is an earth-fill embankment dam on the Peri River (a tributary of the Euphrates), located 15 km (9 mi) northwest of Karakoçan on the border of Elazığ and Tunceli Provinces, Turkey. Its primary purpose is hydroelectric power generation and is the fifth dam in the Peri River cascade. Construction on the dam began in 2003 and its power station was commissioned in 2008. It contains two 29.39 MW Francis turbine-generators for a total installed capacity of 58.78 MW. It is owned and operated by Limak Energy and Bilgin Energy. The sand and gravel-fill dam is 48.5 m (159 ft) tall. (en)
  • ГЕС Сейрантепе (тур. Seyrantepe Barajı) – гідроелектростанція на південному сході Туреччини. Знаходячись між ГЕС Пембелік (вище по течії) та ГЕС Татар, входить до складу каскаду на річці Peri Suyu Çayı, лівій притоці Мунзур-Чай, котра в свою чергу є правою притокою Мурату (лівий витік Євфрату). В межах проекту річку перекрили греблею висотою 36 метрів, яка включає кам'яно-накидну ділянку із глиняним ядром та секцію бетонних водоскидів. Вона утримує водосховище з об’ємом 23,5 млн м3. Видача продукції відбувається по ЛЕП, розрахованій на роботу під напругою 154 кВ. (uk)
rdfs:label
  • Seyrantepe-Talsperre (de)
  • Seyrantepe Dam (en)
  • ГЕС Сейрантепе (uk)
owl:sameAs
geo:geometry
  • POINT(39.891632080078 39.021022796631)
geo:lat
  • 39.021023 (xsd:float)
geo:long
  • 39.891632 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Seyrantepe Dam (en)
is dbo:wikiPageDisambiguates of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License