Sewa-II is a hydroelectric power station located in the Himalayan region in Kathua District Jammu and Kashmir state. It is constructed by NHPC Limited on the Sewa River, a tributary of the Ravi River. Commissioned in 2010, it has a surface power house with the capacity of 120 MW, comprising three Pelton wheel units of 40 MW each, which are fed through a 10km headrace tunnel from the Sewa II Reservoir, giving a maximum water head of 599m. The Sewa II Dam has a height of 53m. The power station generates 534 GW⋅h annually in a 90% dependable year. The beneficiary states of the project include Jammu & Kashmir, Punjab, Haryana, Uttar Pradesh, Uttarakhand, Delhi, Rajasthan and Union Territory of Chandigarh.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Sewa-II (en)
- ГЕС Сева II (uk)
|
rdfs:comment
| - Sewa-II is a hydroelectric power station located in the Himalayan region in Kathua District Jammu and Kashmir state. It is constructed by NHPC Limited on the Sewa River, a tributary of the Ravi River. Commissioned in 2010, it has a surface power house with the capacity of 120 MW, comprising three Pelton wheel units of 40 MW each, which are fed through a 10km headrace tunnel from the Sewa II Reservoir, giving a maximum water head of 599m. The Sewa II Dam has a height of 53m. The power station generates 534 GW⋅h annually in a 90% dependable year. The beneficiary states of the project include Jammu & Kashmir, Punjab, Haryana, Uttar Pradesh, Uttarakhand, Delhi, Rajasthan and Union Territory of Chandigarh. (en)
- ГЕС Сева II – гідроелектростанція на північному заході Індії у штаті Джамму та Кашмір. Використовує ресурс із річки Сева, правої притоки Раві, яка в свою чергу є лівою притокою Чинабу (впадає праворуч до Сатледжу, найбільшого лівого допливу Інду). В межах проекту річку перекрили бетонною арково-гравітаційною греблею висотою 53 метрів та довжиною 112 метрів, яка потребувала 132 тис м3 матеріалу. На час будівництва воду відвели за допомогою тунелю довжиною 0,3 км з діаметром 6 метрів. Гребля утворила водосховище з площею поверхні 0,43 км2 та об'ємом 6,7 млн м3 (корисний об’єм 4,4 млн м3). (uk)
|
geo:lat
| |
geo:long
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
georss:point
| |
has abstract
| - Sewa-II is a hydroelectric power station located in the Himalayan region in Kathua District Jammu and Kashmir state. It is constructed by NHPC Limited on the Sewa River, a tributary of the Ravi River. Commissioned in 2010, it has a surface power house with the capacity of 120 MW, comprising three Pelton wheel units of 40 MW each, which are fed through a 10km headrace tunnel from the Sewa II Reservoir, giving a maximum water head of 599m. The Sewa II Dam has a height of 53m. The power station generates 534 GW⋅h annually in a 90% dependable year. The beneficiary states of the project include Jammu & Kashmir, Punjab, Haryana, Uttar Pradesh, Uttarakhand, Delhi, Rajasthan and Union Territory of Chandigarh. (en)
- ГЕС Сева II – гідроелектростанція на північному заході Індії у штаті Джамму та Кашмір. Використовує ресурс із річки Сева, правої притоки Раві, яка в свою чергу є лівою притокою Чинабу (впадає праворуч до Сатледжу, найбільшого лівого допливу Інду). В межах проекту річку перекрили бетонною арково-гравітаційною греблею висотою 53 метрів та довжиною 112 метрів, яка потребувала 132 тис м3 матеріалу. На час будівництва воду відвели за допомогою тунелю довжиною 0,3 км з діаметром 6 метрів. Гребля утворила водосховище з площею поверхні 0,43 км2 та об'ємом 6,7 млн м3 (корисний об’єм 4,4 млн м3). Зі сховища під правобережним гірським масивом прокладено дериваційний тунель довжиною 10,1 км з діаметром 3,3 метра, який транспортує ресурс до машинного залу, розташовfного за 24 км нижче по течії від греблі. Основне обладнання станції становлять три турбіни типу Пелтон потужністю по 40 МВт, які працюють при напорі у 560 метрів та забезпечують виробництво 534 млн кВт-год електроенергії на рік. Видача продукції відбувається по ЛЕП, розрахованій на роботу під напругою 132 кВ. (uk)
|
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(75.821502685547 32.676200866699)
|
is Link from a Wikipage to another Wikipage
of | |
is foaf:primaryTopic
of | |