The Sandpiper pipeline was a proposed 616-mile-long (991 km) underground oil pipeline project in the United States. It would have carried light crude oil from the Bakken oil fields in Northwest North Dakota, through Minnesota, to end in Superior, Wisconsin. Enbridge Energy Partners, and Williston Basin Pipe Line LLC, an indirect subsidiary of Marathon Petroleum Corporation had planned the project since 2013. In 2015 Enbridge estimated the pipeline will cost about $2.6 billion.
Attributes | Values |
---|
rdfs:label
| |
rdfs:comment
| - The Sandpiper pipeline was a proposed 616-mile-long (991 km) underground oil pipeline project in the United States. It would have carried light crude oil from the Bakken oil fields in Northwest North Dakota, through Minnesota, to end in Superior, Wisconsin. Enbridge Energy Partners, and Williston Basin Pipe Line LLC, an indirect subsidiary of Marathon Petroleum Corporation had planned the project since 2013. In 2015 Enbridge estimated the pipeline will cost about $2.6 billion. (en)
|
name
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
through
| - North Dakota, Clearbrook, Minnesota and Wisconsin (en)
|
dbp:wikiPageUsesTemplate
| |
diameter in
| |
country
| |
length mi
| |
operator
| - Enbridge Energy Partners (en)
|
owner
| - Enbridge Energy Partners, L.P. (en)
|
partners
| - Williston Basin Pipe Line LLC, an indirect subsidiary of Marathon Petroleum Corporation. North Dakota Pipeline Company LLC assets, formerly known as Enbridge Pipelines LLC (en)
|
start
| - Beaver Lodge Station, south of Tioga, North Dakota (en)
|
type
| |
finish
| |
has abstract
| - The Sandpiper pipeline was a proposed 616-mile-long (991 km) underground oil pipeline project in the United States. It would have carried light crude oil from the Bakken oil fields in Northwest North Dakota, through Minnesota, to end in Superior, Wisconsin. Enbridge Energy Partners, and Williston Basin Pipe Line LLC, an indirect subsidiary of Marathon Petroleum Corporation had planned the project since 2013. In 2015 Enbridge estimated the pipeline will cost about $2.6 billion. In 2016 Enbridge announced the cancellation of the pipeline, their withdrawal of their state application and their request to end an environmental impact statement and regulatory proceedings. (en)
|
discharge bbl d
| |
expected
| |
pumping stations
| - new pump station and tanks in Clearbrook (en)
|
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
foaf:isPrimaryTopicOf
| |
is Link from a Wikipage to another Wikipage
of | |
is Wikipage disambiguates
of | |
is foaf:primaryTopic
of | |