About: Line 7 (Suzhou Rail Transit)     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:RailwayLine, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FLine_7_%28Suzhou_Rail_Transit%29

Line 7 of Suzhou Rail Transit is an under construction rapid transit line in Suzhou. Construction started on December 25, 2019. The line will be 29.6 kilometers long. According to the plans, the part of Line 4 between Hongzhuang and Muli stations will be operated as Line 7. It has Tian'edang Parking area (Chinese: 天鹅荡停车场) in the line.

AttributesValues
rdf:type
rdfs:label
  • Line 7 (Suzhou Rail Transit) (en)
  • 苏州轨道交通7号线 (zh)
rdfs:comment
  • Line 7 of Suzhou Rail Transit is an under construction rapid transit line in Suzhou. Construction started on December 25, 2019. The line will be 29.6 kilometers long. According to the plans, the part of Line 4 between Hongzhuang and Muli stations will be operated as Line 7. It has Tian'edang Parking area (Chinese: 天鹅荡停车场) in the line. (en)
  • 苏州轨道交通7号线是中国江苏省苏州一条规划中的轨道交通线路。线路规划从相城区至吴中区木里站。其中红庄站至木里站作为苏州轨道交通4号线的支线已于2017年4月15日开通运营,该段线路全长11.1公里,设7个站,并设天鹅荡停车场一处。 (zh)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/SZRT_Line_7_icon.svg
  • http://commons.wikimedia.org/wiki/Special:FilePath/Tongyuanlu_construction.jpg
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
stations
dbp:wikiPageUsesTemplate
thumbnail
caption
  • Line 7 Under Construction at Tongyuanlu South station (en)
end
image width
logo
  • SZRT_Line_7_icon.svg (en)
logo width
map state
  • collapsed (en)
operator
  • Suzhou Rail Transit Co., Ltd (en)
owner
  • Suzhou Rail Transit Co., Ltd (en)
start
status
  • (en)
  • Under construction (en)
system
type
has abstract
  • Line 7 of Suzhou Rail Transit is an under construction rapid transit line in Suzhou. Construction started on December 25, 2019. The line will be 29.6 kilometers long. According to the plans, the part of Line 4 between Hongzhuang and Muli stations will be operated as Line 7. It has Tian'edang Parking area (Chinese: 天鹅荡停车场) in the line. (en)
  • 苏州轨道交通7号线是中国江苏省苏州一条规划中的轨道交通线路。线路规划从相城区至吴中区木里站。其中红庄站至木里站作为苏州轨道交通4号线的支线已于2017年4月15日开通运营,该段线路全长11.1公里,设7个站,并设天鹅荡停车场一处。 (zh)
linelength
line length (μ)
number of stations
prov:wasDerivedFrom
page length (characters) of wiki page
status
  • Under construction
  • (one segment is operational)
is part of
route end
route start
type
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is Wikipage disambiguates of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3331 as of Sep 2 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (61 GB total memory, 49 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software