The Brandon Shores Generating Station is an electric generating station located on Fort Smallwood Road north of Orchard Beach in Anne Arundel County, Maryland, near Glen Burnie, and is operated by Raven Power Holdings, Inc. Brandon Shores consists of two Babcock & Wilcox coal-fired boilers and two General Electric steam turbines with a combined nominal generating capacity of 1370 MWe. Unit 1 went into operation in May 1984 and Unit 2 in May 1991.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Brandon Shores Generating Station (en)
|
rdfs:comment
| - The Brandon Shores Generating Station is an electric generating station located on Fort Smallwood Road north of Orchard Beach in Anne Arundel County, Maryland, near Glen Burnie, and is operated by Raven Power Holdings, Inc. Brandon Shores consists of two Babcock & Wilcox coal-fired boilers and two General Electric steam turbines with a combined nominal generating capacity of 1370 MWe. Unit 1 went into operation in May 1984 and Unit 2 in May 1991. (en)
|
foaf:name
| - Brandon Shores Generating Station (en)
|
foaf:homepage
| |
name
| - Brandon Shores Generating Station (en)
|
geo:lat
| |
geo:long
| |
foaf:depiction
| |
location
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
th fuel primary
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
country
| |
image caption
| - Brandon Shores Generating Station viewed from the south (en)
|
location
| |
owner
| |
status
| |
website
| |
commissioned
| - Unit 1: May, 1984 (en)
- Unit 2: May, 1991 (en)
|
georss:point
| - 39.18138888888889 -76.53777777777778
|
has abstract
| - The Brandon Shores Generating Station is an electric generating station located on Fort Smallwood Road north of Orchard Beach in Anne Arundel County, Maryland, near Glen Burnie, and is operated by Raven Power Holdings, Inc. Brandon Shores consists of two Babcock & Wilcox coal-fired boilers and two General Electric steam turbines with a combined nominal generating capacity of 1370 MWe. Unit 1 went into operation in May 1984 and Unit 2 in May 1991. The station shares a 483-acre (195 ha) site adjacent to the Patapsco River with the Herbert A. Wagner Generating Station. The Brandon Shores plant dominates the site with its 700-foot (210 m) exhaust and 400-foot (120 m) flue-gas desulfurization (FGD) system stacks. Talen Energy will convert the coal-fired units to alternative fuels by 2025. (en)
|
ps cooling source
| |
ps electrical capacity
| |
ps units operational
| |