The A10 motorway (Romanian: Autostrada A10), also known as the Sebeș–Turda Motorway (Romanian: Autostrada Sebeș–Turda), is a motorway in the central-western part of Romania, connecting the A1 and A3 motorways, between the cities of Sebeș and Turda, also providing access to Alba Iulia and Aiud. It is 70 km long, with a total cost of 420 million euro, which is financed in proportion of 85% from the European Union funds, the rest of 15% being insured from the state budget. The motorway's construction was divided into four lots: works for lots 3 and 4 began on 20 May 2014, whereas for the other two lots began in 2015.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - A10 motorway (Romania) (en)
- Autoroute A10 (Roumanie) (fr)
- A10 (Roemenië) (nl)
- Autostrada A10 (Rumunia) (pl)
|
rdfs:comment
| - L'autoroute A10 (en roumain : Autostrada A10) est un projet d'autoroute en Roumanie actuellement en construction qui relie les villes de Sebeş et de Turda, et assurant une liaison entre les autoroutes roumaines A1 et A3. La construction de l'autoroute a démarré en 2014 et a été achevée en 2021. Elle permet donc de relier les autoroutes A1 et A3 au centre de la Transylvanie. (fr)
- De A10 is een snelweg in Roemenië, die Turda verbindt met Sebes. De snelweg loopt langs Aiud en Alba Iulia. De snelweg is in delen opgeleverd, het eerste deel tussen Turda en Aiud werd in 2016 geopend. Te totale snelweg zal klaar moeten zijn in 2021. De totale lengte van de snelweg zal 70 kilometer zijn. De kosten worden voor 85% gedragen door de Europese Unie en 15% door de Roemeense overheid. De weg zal de verbinding vormen tussen de A3 van Cluj-Napoca naar Turda en de A1 van Arad naar Sibiu. Hoofdwegen in Roemenië (nl)
- The A10 motorway (Romanian: Autostrada A10), also known as the Sebeș–Turda Motorway (Romanian: Autostrada Sebeș–Turda), is a motorway in the central-western part of Romania, connecting the A1 and A3 motorways, between the cities of Sebeș and Turda, also providing access to Alba Iulia and Aiud. It is 70 km long, with a total cost of 420 million euro, which is financed in proportion of 85% from the European Union funds, the rest of 15% being insured from the state budget. The motorway's construction was divided into four lots: works for lots 3 and 4 began on 20 May 2014, whereas for the other two lots began in 2015. (en)
|
foaf:depiction
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
counties
| |
cities
| |
country
| |
direction a
| |
direction b
| |
established
| |
length km
| |
maint
| - Compania Națională de Autostrăzi și Drumuri Naționale din România (en)
|
map notes
| - Map of the A10 motorway, as of July 2018 (en)
|
photo
| - Autostrada A 10 .jpg (en)
|
route
| |
terminus a
| |
terminus b
| |
type
| |
has abstract
| - The A10 motorway (Romanian: Autostrada A10), also known as the Sebeș–Turda Motorway (Romanian: Autostrada Sebeș–Turda), is a motorway in the central-western part of Romania, connecting the A1 and A3 motorways, between the cities of Sebeș and Turda, also providing access to Alba Iulia and Aiud. It is 70 km long, with a total cost of 420 million euro, which is financed in proportion of 85% from the European Union funds, the rest of 15% being insured from the state budget. The motorway's construction was divided into four lots: works for lots 3 and 4 began on 20 May 2014, whereas for the other two lots began in 2015. Since 2021, it has been operational on its entire length. Near Oiejdea, however, it is only operational on two lanes, due to a landslide that occurred in the area that was still not resolved. The motorway became fully operational on 19 November 2022. (en)
- L'autoroute A10 (en roumain : Autostrada A10) est un projet d'autoroute en Roumanie actuellement en construction qui relie les villes de Sebeş et de Turda, et assurant une liaison entre les autoroutes roumaines A1 et A3. La construction de l'autoroute a démarré en 2014 et a été achevée en 2021. Elle permet donc de relier les autoroutes A1 et A3 au centre de la Transylvanie. (fr)
- De A10 is een snelweg in Roemenië, die Turda verbindt met Sebes. De snelweg loopt langs Aiud en Alba Iulia. De snelweg is in delen opgeleverd, het eerste deel tussen Turda en Aiud werd in 2016 geopend. Te totale snelweg zal klaar moeten zijn in 2021. De totale lengte van de snelweg zal 70 kilometer zijn. De kosten worden voor 85% gedragen door de Europese Unie en 15% door de Roemeense overheid. De weg zal de verbinding vormen tussen de A3 van Cluj-Napoca naar Turda en de A1 van Arad naar Sibiu. Hoofdwegen in Roemenië (nl)
|
next route
| |
next type
| |