An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org:8891

The Yancheng–Nantong high speed railway is a high speed line between Yancheng and Nantong in China. It has a length of 156.6 kilometres (97.3 mi) and a design speed of 350 kilometres per hour (220 mph). The line is expected to open on 30 December 2020. The initial operating speed will be 300 kilometres per hour (190 mph).

Property Value
dbo:abstract
  • The Yancheng–Nantong high speed railway is a high speed line between Yancheng and Nantong in China. It has a length of 156.6 kilometres (97.3 mi) and a design speed of 350 kilometres per hour (220 mph). The line is expected to open on 30 December 2020. The initial operating speed will be 300 kilometres per hour (190 mph). (en)
  • 盐通高速铁路,是中华人民共和国江苏省一条连接盐城市与南通市的高速铁路。线路北起盐城站,南至南通西站,正线全长156.6公里,桥梁长度约占94.6%,共设车站6个。设计最高时速350km/h,初期运营速度300km/h。 盐通铁路由中国铁建股份有限公司所属(铁五院)和苏交科集团股份有限公司进行可行性研究和勘察设计。 (zh)
dbo:lineLength
  • 156600.000000 (xsd:double)
dbo:location
dbo:openingYear
  • 2020-01-01 (xsd:gYear)
dbo:operator
dbo:routeEnd
dbo:routeStart
dbo:speedLimit
  • 350.000000 (xsd:double)
dbo:status
  • Under construction
dbo:wikiPageID
  • 65931690 (xsd:integer)
dbo:wikiPageLength
  • 3159 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1081652924 (xsd:integer)
dbo:wikiPageWikiLink
dbp:end
dbp:locale
dbp:logoWidth
  • 180 (xsd:integer)
dbp:mapState
  • collapsed (en)
dbp:name
  • high-speed railway (en)
  • Yancheng–Nantong (en)
  • 盐通高铁 (en)
dbp:open
  • 2020 (xsd:integer)
dbp:operator
dbp:start
dbp:status
  • Under construction (en)
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • The Yancheng–Nantong high speed railway is a high speed line between Yancheng and Nantong in China. It has a length of 156.6 kilometres (97.3 mi) and a design speed of 350 kilometres per hour (220 mph). The line is expected to open on 30 December 2020. The initial operating speed will be 300 kilometres per hour (190 mph). (en)
  • 盐通高速铁路,是中华人民共和国江苏省一条连接盐城市与南通市的高速铁路。线路北起盐城站,南至南通西站,正线全长156.6公里,桥梁长度约占94.6%,共设车站6个。设计最高时速350km/h,初期运营速度300km/h。 盐通铁路由中国铁建股份有限公司所属(铁五院)和苏交科集团股份有限公司进行可行性研究和勘察设计。 (zh)
rdfs:label
  • Yancheng–Nantong high-speed railway (en)
  • 盐通高速铁路 (zh)
owl:sameAs
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
foaf:name
  • (en)
  • high-speed railway (en)
  • Yancheng–Nantong (en)
  • 盐通高铁 (en)
is dbo:servingRailwayLine of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is dbp:line of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License