dbo:Infrastructure/length
| |
dbo:abstract
|
- The Woodsmith Mine Tunnel (also known as a Mineral Transport System [MTS]) is a 23-mile (37 km) long tunnel that will stretch between Woodsmith Mine at Sneatonthorpe near Whitby in North Yorkshire and the Wilton International complex on Teesside, England. The tunnel has been in development since 2016, but cutting of the tunnel bore did not start until April 2019, with an expected finish date of 2021. By the end of July 2020, over 4 miles (6.4 km) of tunnel had been dug. When finished, the tunnel will be the longest tunnel in the United Kingdom and will also house the longest conveyor in the UK. The estimated cost of the tunnel in November 2018 was £1.1 billion. (en)
|
dbo:architect
| |
dbo:buildingEndYear
| |
dbo:buildingStartYear
| |
dbo:height
| |
dbo:length
|
- 37014.912000 (xsd:double)
|
dbo:location
| |
dbo:numberOfTracks
|
- 1 (xsd:nonNegativeInteger)
|
dbo:owner
| |
dbo:routeEndLocation
| |
dbo:routeStartLocation
| |
dbo:speedLimit
| |
dbo:status
| |
dbo:thumbnail
| |
dbo:width
| |
dbo:wikiPageExternalLink
| |
dbo:wikiPageID
| |
dbo:wikiPageLength
|
- 27373 (xsd:nonNegativeInteger)
|
dbo:wikiPageRevisionID
| |
dbo:wikiPageWikiLink
| |
dbo:yearOfConstruction
| |
dbp:alt
|
- Image of a construction site surrounded by moorland (en)
|
dbp:caption
| |
dbp:character
| |
dbp:construction
| |
dbp:crosses
| |
dbp:end
| |
dbp:engineer
| |
dbp:location
| |
dbp:name
|
- Woodsmith Mine Tunnel (en)
|
dbp:notrack
| |
dbp:officialName
|
- Mineral Transport System (en)
|
dbp:opens
| |
dbp:owner
| |
dbp:start
| |
dbp:startwork
| |
dbp:status
| |
dbp:traffic
| |
dbp:wikiPageUsesTemplate
| |
dcterms:subject
| |
georss:point
| |
rdf:type
| |
rdfs:comment
|
- The Woodsmith Mine Tunnel (also known as a Mineral Transport System [MTS]) is a 23-mile (37 km) long tunnel that will stretch between Woodsmith Mine at Sneatonthorpe near Whitby in North Yorkshire and the Wilton International complex on Teesside, England. The tunnel has been in development since 2016, but cutting of the tunnel bore did not start until April 2019, with an expected finish date of 2021. By the end of July 2020, over 4 miles (6.4 km) of tunnel had been dug. (en)
|
rdfs:label
|
- Woodsmith Mine Tunnel (en)
|
owl:sameAs
| |
geo:geometry
|
- POINT(-0.90020000934601 54.494201660156)
|
geo:lat
| |
geo:long
| |
prov:wasDerivedFrom
| |
foaf:depiction
| |
foaf:homepage
| |
foaf:isPrimaryTopicOf
| |
foaf:name
|
- Woodsmith Mine Tunnel (en)
|
is dbo:wikiPageWikiLink
of | |
is foaf:primaryTopic
of | |