An Entity of Type: Thing, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org:8891

Since the late 20th century, the Metropolitan Transportation Authority has started several projects to maintain and improve the New York City Subway. Some of these projects, such as subway line automation, proposed platform screen doors, the FASTRACK maintenance program, and infrastructural improvements proposed in 2015–2019 Capital Program, contribute toward improving the system's efficiency. Others, such as train-arrival "countdown clocks", "Help Point" station intercoms, "On the Go! Travel Station" passenger kiosks, wireless and cellular network connections in stations, MetroCard fare payment alternatives, and digital ads, are meant to benefit individual passengers. Yet others, including the various methods of subway construction, do not directly impact the passenger interface, but are

Property Value
dbo:abstract
  • Since the late 20th century, the Metropolitan Transportation Authority has started several projects to maintain and improve the New York City Subway. Some of these projects, such as subway line automation, proposed platform screen doors, the FASTRACK maintenance program, and infrastructural improvements proposed in 2015–2019 Capital Program, contribute toward improving the system's efficiency. Others, such as train-arrival "countdown clocks", "Help Point" station intercoms, "On the Go! Travel Station" passenger kiosks, wireless and cellular network connections in stations, MetroCard fare payment alternatives, and digital ads, are meant to benefit individual passengers. Yet others, including the various methods of subway construction, do not directly impact the passenger interface, but are used to make subway operations efficient. In the mid-1990s, it started converting the BMT Canarsie Line to use communications-based train control, using a moving block signal system that allowed more trains to use the tracks and thus increasing passenger capacity. After the Canarsie Line tests were successful, the MTA expanded the automation program in the 2000s and 2010s to include other lines. This led to a 2017 proposal to install platform screen doors in one Canarsie Line station. Additionally, as part of another program called FASTRACK, the MTA started closing certain lines during weekday nights in 2012, with each of the lines closing overnight for a week in order to allow workers to clean these lines without being hindered by train movements. The program was expanded beyond Manhattan the next year after noticing how efficient the FASTRACK program was compared to previous service diversions. In 2015, the MTA announced a wide-ranging improvement program as part of the 2015–2019 Capital Program. Thirty stations would be extensively rebuilt under the Enhanced Station Initiative, and new R211 subway cars would be able to fit more passengers. The MTA has also started some projects to improve passenger amenities. It added train arrival "countdown clocks" to most A Division (numbered route) stations and the BMT Canarsie Line (L train) by late 2011, allowing passengers on these routes to see train arrival times using real-time data. A similar countdown-clock project for the B Division (lettered routes) and the IRT Flushing Line was deferred until 2016, when a new Bluetooth-based clock system was tested successfully. Beginning in 2011, the MTA installed "Help Point" to aid with emergency calls or station agent assistance, in all stations. Interactive touchscreen "On The Go! Travel Station" kiosks, which give station advisories, itineraries, and timetables, were installed starting in 2011 but later removed in 2020. Cellular phone and wireless data in stations, first installed in 2011 as part of a pilot program, was expanded systemwide due to positive passenger feedback. Additionally, credit-card trials at several subway stations in 2006 and 2010 led to proposals for OMNY, a contactless payment system to replace the aging MetroCard system used to pay fares on MTA-operated transportation. Finally, in 2017, the MTA started installing digital advertisements in trains and stations. (en)
dbo:thumbnail
dbo:wikiPageID
  • 55208663 (xsd:integer)
dbo:wikiPageLength
  • 134337 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1114471291 (xsd:integer)
dbo:wikiPageWikiLink
dbp:align
  • right (en)
dbp:caption
  • Simple next-train signs of the type used on parts of the B Division, at 125th Street on the IND Eighth Avenue Line. This clock shows the track on which the train is arriving, the number of stops away for the next train, and whether the train is local or express. (en)
  • Detailed next-train signs of the type used on parts of the B Division, at Cortlandt Street on the BMT Broadway Line. This clock shows the train's service, destination, estimated arrival time, current clock time, weather, and service advisories. (en)
  • Detailed next-train signs of the type used on the BMT Canarsie Line, at Lorimer Street. This clock shows the train's service, destination, and estimated arrival time. This clock has since been replaced with a new system similar to the one below. (en)
  • Detailed next-train signs of the type used on the A Division, at 59th Street on the IRT Lexington Avenue Line. This clock shows the train's service, destination, estimated arrival time, chronological sequence, track on which the train is arriving, and whether the train is local or express. (en)
dbp:direction
  • vertical (en)
dbp:footer
  • A sample fare control area and platform level of 53rd Street, a station rebuilt under the 2015–2019 modernization plan (en)
dbp:header
  • Different types of train arrival countdown clocks (en)
dbp:image
  • 59 (xsd:integer)
  • 125 (xsd:integer)
  • Reopening of 53rd St ESI Station .jpg (en)
  • Chambers St WTC td 19 - Cortlandt Street passageway.jpg (en)
  • Lorimer St-Countdown clock.jpg (en)
dbp:width
  • 220 (xsd:integer)
  • 250 (xsd:integer)
dbp:wikiPageUsesTemplate
dcterms:subject
rdfs:comment
  • Since the late 20th century, the Metropolitan Transportation Authority has started several projects to maintain and improve the New York City Subway. Some of these projects, such as subway line automation, proposed platform screen doors, the FASTRACK maintenance program, and infrastructural improvements proposed in 2015–2019 Capital Program, contribute toward improving the system's efficiency. Others, such as train-arrival "countdown clocks", "Help Point" station intercoms, "On the Go! Travel Station" passenger kiosks, wireless and cellular network connections in stations, MetroCard fare payment alternatives, and digital ads, are meant to benefit individual passengers. Yet others, including the various methods of subway construction, do not directly impact the passenger interface, but are (en)
rdfs:label
  • Technology of the New York City Subway (en)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License