An Entity of Type: Rapid transit, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org:8891

Kolkata Metro Line 6 or the Orange Line of the Kolkata Metro is an under-construction rapid transit line that will connect New Garia with Netaji Subhas Chandra Bose International Airport via two satellite towns Salt Lake and New Town. The line is targeted to open from Kavi Subhash to Hemanta Mukherjee in 2022. This stretch will be one of the most important stretches of metro because it will connect the southern and the eastern parts of the city with Kolkata Airport. Total distance of this route will be 29.87 km (18.56 mi).

Property Value
dbo:abstract
  • Kolkata Metro Line 6 or the Orange Line of the Kolkata Metro is an under-construction rapid transit line that will connect New Garia with Netaji Subhas Chandra Bose International Airport via two satellite towns Salt Lake and New Town. The line is targeted to open from Kavi Subhash to Hemanta Mukherjee in 2022. This stretch will be one of the most important stretches of metro because it will connect the southern and the eastern parts of the city with Kolkata Airport. Total distance of this route will be 29.87 km (18.56 mi). (en)
dbo:isPartOf
dbo:lineLength
  • 29870.000000 (xsd:double)
dbo:location
dbo:numberOfStations
  • 24 (xsd:nonNegativeInteger)
dbo:operator
dbo:owner
dbo:routeEnd
dbo:routeStart
dbo:speedLimit
  • 80.000000 (xsd:double)
dbo:status
  • Under construction
dbo:thumbnail
dbo:type
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 51905185 (xsd:integer)
dbo:wikiPageLength
  • 12998 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1122796010 (xsd:integer)
dbo:wikiPageWikiLink
dbp:character
  • (en)
  • Elevated – 22 (en)
  • Surface – 1 (en)
  • Underground – 1 (en)
dbp:color
  • b82880 (en)
dbp:dailyRidership
  • 500000 (xsd:integer)
dbp:depot
  • * NSCBI Airport * New Garia * New Town (en)
dbp:electrification
  • 750 (xsd:integer)
dbp:end
dbp:gauge
  • broad gauge (en)
dbp:linenumber
  • 6 (xsd:integer)
dbp:locale
  • Kolkata metropolitan area, India (en)
dbp:mapState
  • show (en)
dbp:name
  • 100 (xsd:integer)
dbp:operator
dbp:otherName
  • * New Town metro * Airport Metro * Bypass Metro (en)
dbp:owner
dbp:planopen
  • 2022 (xsd:integer)
dbp:signalling
dbp:speed
  • 80.0
dbp:start
dbp:stations
  • 24 (xsd:integer)
dbp:status
  • Under construction (en)
dbp:system
dbp:tracks
  • 2 (xsd:integer)
dbp:type
dbp:website
dbp:wikiPageUsesTemplate
dbp:yearcommenced
  • 2012 (xsd:integer)
dcterms:subject
rdf:type
rdfs:comment
  • Kolkata Metro Line 6 or the Orange Line of the Kolkata Metro is an under-construction rapid transit line that will connect New Garia with Netaji Subhas Chandra Bose International Airport via two satellite towns Salt Lake and New Town. The line is targeted to open from Kavi Subhash to Hemanta Mukherjee in 2022. This stretch will be one of the most important stretches of metro because it will connect the southern and the eastern parts of the city with Kolkata Airport. Total distance of this route will be 29.87 km (18.56 mi). (en)
rdfs:label
  • Kolkata Metro Line 6 (en)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:homepage
foaf:isPrimaryTopicOf
foaf:name
  • 100px (en)
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License