An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org:8891

Karachi–Peshawar Railway Line (Urdu: کراچی–پشاور مرکزی ریل راستہ, romanized: karāčī-pešāvar markazī rēl rāsta) (also referred to as Main Line 1 or ML-1) is one of four main railway lines in Pakistan, operated and maintained by Pakistan Railways. The line begins from Karachi City station or Kiamari station and ends at Peshawar Cantonment Station. The total length of this railway line is 1,687 kilometers (1,048 mi). There are 184 railway stations from Kiamari to Peshawar Cantonment on this line. The line serves as the main passenger and freight line of the country. 75% of the country's cargo and passenger traffic uses the line. The line is currently undergoing a six-year Rs. 1286.68 billion (US$5.6 billion) upgrade and renovation as part of the China Pakistan Economic Corridor, with average

Property Value
dbo:abstract
  • Karachi–Peshawar Railway Line (Urdu: کراچی–پشاور مرکزی ریل راستہ, romanized: karāčī-pešāvar markazī rēl rāsta) (also referred to as Main Line 1 or ML-1) is one of four main railway lines in Pakistan, operated and maintained by Pakistan Railways. The line begins from Karachi City station or Kiamari station and ends at Peshawar Cantonment Station. The total length of this railway line is 1,687 kilometers (1,048 mi). There are 184 railway stations from Kiamari to Peshawar Cantonment on this line. The line serves as the main passenger and freight line of the country. 75% of the country's cargo and passenger traffic uses the line. The line is currently undergoing a six-year Rs. 1286.68 billion (US$5.6 billion) upgrade and renovation as part of the China Pakistan Economic Corridor, with average rail speeds expected be doubled to 160 kilometers per hour upon completion. (en)
  • 卡拉奇-白沙瓦铁路(英語:Karachi–Peshawar Railway Line,乌尔都语:کراچی–پشاور مرکزی راه آهن خط‎‎),又称为1号铁路干线(英語:Main Line 1,缩写为ML-1),是巴基斯坦一条连接卡拉奇与白沙瓦的铁路,是该国四条之一。该铁路由巴基斯坦铁路运营和维护,主线全长1,687公里(1,048英里),全程共设184个车站。 卡拉奇-白沙瓦铁路是巴基斯坦的主要客货运铁路线,全线客货运量占巴基斯坦全国的75%。目前的卡拉奇-白沙瓦铁路是由1861年至1900年间建成的四条铁路连接组成的,其中最早通车的卡拉奇-科特里段于1861年开通。作为中巴经济走廊的一部分,该铁路目前正进行全线升级改造,预计建成后均速可达160千米/时。 (zh)
dbo:lineLength
  • 1872000.000000 (xsd:double)
dbo:numberOfStations
  • 184 (xsd:nonNegativeInteger)
dbo:operator
dbo:owner
dbo:routeEnd
dbo:routeStart
dbo:speedLimit
  • 60.000000 (xsd:double)
  • 160.000000 (xsd:double)
dbo:thumbnail
dbo:wikiPageID
  • 51547301 (xsd:integer)
dbo:wikiPageLength
  • 19836 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1100708944 (xsd:integer)
dbo:wikiPageWikiLink
dbp:boxWidth
  • 350 (xsd:integer)
dbp:caption
  • PR rail network with Main Line 1 highlighted in black (en)
dbp:end
dbp:linelengthKm
  • 1872 (xsd:integer)
dbp:mapState
  • collapsed (en)
dbp:name
  • Karachi–Peshawar Railway Line (en)
dbp:nativeNameLang
  • Urdu (en)
dbp:operator
dbp:otherName
  • ML-1 (en)
  • Main Line 1 (en)
dbp:owner
dbp:speed
  • to (en)
dbp:start
  • Karachi City or Kiamari (en)
dbp:stations
  • 184 (xsd:integer)
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • 卡拉奇-白沙瓦铁路(英語:Karachi–Peshawar Railway Line,乌尔都语:کراچی–پشاور مرکزی راه آهن خط‎‎),又称为1号铁路干线(英語:Main Line 1,缩写为ML-1),是巴基斯坦一条连接卡拉奇与白沙瓦的铁路,是该国四条之一。该铁路由巴基斯坦铁路运营和维护,主线全长1,687公里(1,048英里),全程共设184个车站。 卡拉奇-白沙瓦铁路是巴基斯坦的主要客货运铁路线,全线客货运量占巴基斯坦全国的75%。目前的卡拉奇-白沙瓦铁路是由1861年至1900年间建成的四条铁路连接组成的,其中最早通车的卡拉奇-科特里段于1861年开通。作为中巴经济走廊的一部分,该铁路目前正进行全线升级改造,预计建成后均速可达160千米/时。 (zh)
  • Karachi–Peshawar Railway Line (Urdu: کراچی–پشاور مرکزی ریل راستہ, romanized: karāčī-pešāvar markazī rēl rāsta) (also referred to as Main Line 1 or ML-1) is one of four main railway lines in Pakistan, operated and maintained by Pakistan Railways. The line begins from Karachi City station or Kiamari station and ends at Peshawar Cantonment Station. The total length of this railway line is 1,687 kilometers (1,048 mi). There are 184 railway stations from Kiamari to Peshawar Cantonment on this line. The line serves as the main passenger and freight line of the country. 75% of the country's cargo and passenger traffic uses the line. The line is currently undergoing a six-year Rs. 1286.68 billion (US$5.6 billion) upgrade and renovation as part of the China Pakistan Economic Corridor, with average (en)
rdfs:label
  • Karachi–Peshawar Line (en)
  • 卡拉奇-白沙瓦铁路 (zh)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Karachi–Peshawar Railway Line (en)
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is dbp:line of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License