An Entity of Type: Rapid transit, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org:8891

Line 8 of the Tianjin Metro (Chinese: 天津地铁8号线; pinyin: Tiānjīn Dìtiě Bā Hào Xiàn) is a rapid transit line running from northwest to southeast Tianjin. The Phase I south section of line 8, which was originally called Line 6 Phase 2 during construction, was opened on 28 December 2021. The line is currently 13.42 km long and has 9 stations. This is the first metro line in Tianjin that uses Type A six car, GoA4 automated trains.

Property Value
dbo:abstract
  • Line 8 of the Tianjin Metro (Chinese: 天津地铁8号线; pinyin: Tiānjīn Dìtiě Bā Hào Xiàn) is a rapid transit line running from northwest to southeast Tianjin. The Phase I south section of line 8, which was originally called Line 6 Phase 2 during construction, was opened on 28 December 2021. The line is currently 13.42 km long and has 9 stations. This is the first metro line in Tianjin that uses Type A six car, GoA4 automated trains. (en)
  • 天津地下鉄8号線(てんしんちかてつ8ごうせん、中文表記: 天津地铁8号线、英文表記: Tianjin Metro Line 8)とは、中華人民共和国天津市津南区のと同区のを結ぶ天津地下鉄の地下鉄路線である。 (ja)
  • 天津地铁8号线,是天津地铁的运营线路之一。线路大致呈西北-东南走向,代表色是紫色。该线路正线全长13.42公里,全线共设9座车站,1座车辆段。线路西起渌水道站,东至咸水沽西站,使用车辆为6编组A型车。该线路目前对外以天津地铁6号线二期名义运营。 (zh)
dbo:isPartOf
dbo:lineLength
  • 13420.000000 (xsd:double)
dbo:location
dbo:numberOfStations
  • 9 (xsd:nonNegativeInteger)
dbo:openingDate
  • 2021-12-28 (xsd:date)
dbo:openingYear
  • 2021-01-01 (xsd:gYear)
dbo:status
  • Operational
dbo:thumbnail
dbo:type
dbo:wikiPageID
  • 69452080 (xsd:integer)
dbo:wikiPageLength
  • 6175 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1094822089 (xsd:integer)
dbo:wikiPageWikiLink
dbp:caption
  • Lushuidao station (en)
dbp:character
  • Underground (en)
dbp:electrification
  • 1500 (xsd:integer)
dbp:locale
dbp:logo
  • Tianjin Metro Line 8 icon.png (en)
dbp:logoWidth
  • 65 (xsd:integer)
dbp:mapState
  • collapsed (en)
dbp:open
  • 2021-12-28 (xsd:date)
dbp:operator
  • CRCC association (en)
dbp:owner
dbp:p
  • Tiānjīn Dìtiě Bā Hào Xiàn (en)
dbp:routes
  • 1 (xsd:integer)
dbp:s
  • 天津地铁8号线 (en)
dbp:stations
  • 9 (xsd:integer)
dbp:status
  • Operational (en)
dbp:system
dbp:tracks
  • 2 (xsd:integer)
dbp:type
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • Line 8 of the Tianjin Metro (Chinese: 天津地铁8号线; pinyin: Tiānjīn Dìtiě Bā Hào Xiàn) is a rapid transit line running from northwest to southeast Tianjin. The Phase I south section of line 8, which was originally called Line 6 Phase 2 during construction, was opened on 28 December 2021. The line is currently 13.42 km long and has 9 stations. This is the first metro line in Tianjin that uses Type A six car, GoA4 automated trains. (en)
  • 天津地下鉄8号線(てんしんちかてつ8ごうせん、中文表記: 天津地铁8号线、英文表記: Tianjin Metro Line 8)とは、中華人民共和国天津市津南区のと同区のを結ぶ天津地下鉄の地下鉄路線である。 (ja)
  • 天津地铁8号线,是天津地铁的运营线路之一。线路大致呈西北-东南走向,代表色是紫色。该线路正线全长13.42公里,全线共设9座车站,1座车辆段。线路西起渌水道站,东至咸水沽西站,使用车辆为6编组A型车。该线路目前对外以天津地铁6号线二期名义运营。 (zh)
rdfs:label
  • Line 8 (Tianjin Metro) (en)
  • 天津地下鉄8号線 (ja)
  • 天津地铁8号线 (zh)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
is dbo:wikiPageDisambiguates of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License