dbo:abstract
|
- Line 7 of the Hangzhou Metro (simplified Chinese: 杭州地铁七号线; traditional Chinese: 杭州地鐵七號線; pinyin: Hángzhōu Dìtiě Qīhào Xiàn) is a metro line in Hangzhou. The line will be 47.48 km long and will run in a west–east direction between Wushan Square station in Shangcheng District and Jiangdong'er Road station in Qiantang District in the east, passing through downtown Hangzhou and providing transfers with multiple other lines in the system. The section between Olympic Sports Center Station and Jiangdong'er Road Station was opened on 30 December 2020, the remaining section opened on 1 April 2022. (en)
- La ligne 7 du métro de Hangzhou (en chinois: 杭州地铁7号线) est une ligne du métro de Hangzhou qui permettra de joindre l'aéroport international de Hangzhou-Xiaoshan et centre-ville de Hangzhou. La ligne comprend 24 stations, avec une longueur de 47,48km. Elle part de la place de Wushan et se termine rue Jiangdong'er. La ligne utilise un train de Type A dont la capacité est plus grande que celle des lignes en service. La section entre rue Jiangdong'er et le Centre Olympique a ouvert le 30 décembre 2020. La station Centre de Citoyen a ouvert le 17 septembre 2021, ainsi que la section sous la rivière Qiantang. (fr)
- 杭州地下鉄7号線(こうしゅうちかてつ7ごうせん、中文表記: 杭州地铁7号线、英文表記: Hangzhou Metro Line 7)は、中華人民共和国浙江省杭州市浜江区のから銭塘区のまでを結ぶ杭州地下鉄の路線である。 (ja)
- 杭州地铁7号线长47.48公里,主体位于江南的萧山区内,标识色是■浪漫紫,西起上城区吴山广场、并与4号线、2号线形成换乘,向东走向与机场高速平行直至萧山国际机场,后沿北直到钱塘区,设有24个站点。该线为连接线,实现了城站火车站和萧山国际机场的轨道连接,进一步加强了钱江新城和钱江世纪城两个CBD的直接联系,同时在萧山境内沿建设三路、建设四路发展轴辐射,是未来的一条主要轨道线路。其中,地铁7号线市民中心站(杭州地铁4号线与7号线的换乘站)于2013年5月17日开工。7号线首通段为奥体中心站至江东二路站,全长约39.3公里,于2020年12月30日开通运营。过江段为奥体中心站至市民中心站,全长约3.0km,于2021年9月17日开通运营。全线于2022年4月1日建成通车运营,全程约63分钟;而从吴山广场至萧山国际机场共16个站,需时43分钟。 (zh)
|
dbo:isPartOf
| |
dbo:lineLength
|
- 47480.000000 (xsd:double)
|
dbo:location
| |
dbo:numberOfStations
|
- 24 (xsd:nonNegativeInteger)
|
dbo:openingDate
| |
dbo:openingYear
| |
dbo:speedLimit
| |
dbo:status
| |
dbo:thumbnail
| |
dbo:type
| |
dbo:wikiPageID
| |
dbo:wikiPageLength
|
- 8400 (xsd:nonNegativeInteger)
|
dbo:wikiPageRevisionID
| |
dbo:wikiPageWikiLink
| |
dbp:caption
|
- Train of Line 7 is departing from Olympic Sports Center (en)
|
dbp:character
| |
dbp:depot
|
- Jiangdongsan Road Stabling Yard (en)
- Yingzhong Depot (en)
|
dbp:electrification
| |
dbp:locale
| |
dbp:mapState
| |
dbp:name
| |
dbp:open
| |
dbp:operator
|
- Hangzhou Metro Corporation (en)
|
dbp:owner
| |
dbp:p
|
- Hángzhōu Dìtiě Qīhào Xiàn (en)
|
dbp:routes
| |
dbp:s
| |
dbp:stations
| |
dbp:status
| |
dbp:stock
| |
dbp:system
| |
dbp:t
| |
dbp:type
| |
dbp:wikiPageUsesTemplate
| |
dcterms:subject
| |
rdf:type
| |
rdfs:comment
|
- Line 7 of the Hangzhou Metro (simplified Chinese: 杭州地铁七号线; traditional Chinese: 杭州地鐵七號線; pinyin: Hángzhōu Dìtiě Qīhào Xiàn) is a metro line in Hangzhou. The line will be 47.48 km long and will run in a west–east direction between Wushan Square station in Shangcheng District and Jiangdong'er Road station in Qiantang District in the east, passing through downtown Hangzhou and providing transfers with multiple other lines in the system. The section between Olympic Sports Center Station and Jiangdong'er Road Station was opened on 30 December 2020, the remaining section opened on 1 April 2022. (en)
- La ligne 7 du métro de Hangzhou (en chinois: 杭州地铁7号线) est une ligne du métro de Hangzhou qui permettra de joindre l'aéroport international de Hangzhou-Xiaoshan et centre-ville de Hangzhou. La ligne comprend 24 stations, avec une longueur de 47,48km. Elle part de la place de Wushan et se termine rue Jiangdong'er. La ligne utilise un train de Type A dont la capacité est plus grande que celle des lignes en service. La section entre rue Jiangdong'er et le Centre Olympique a ouvert le 30 décembre 2020. La station Centre de Citoyen a ouvert le 17 septembre 2021, ainsi que la section sous la rivière Qiantang. (fr)
- 杭州地下鉄7号線(こうしゅうちかてつ7ごうせん、中文表記: 杭州地铁7号线、英文表記: Hangzhou Metro Line 7)は、中華人民共和国浙江省杭州市浜江区のから銭塘区のまでを結ぶ杭州地下鉄の路線である。 (ja)
- 杭州地铁7号线长47.48公里,主体位于江南的萧山区内,标识色是■浪漫紫,西起上城区吴山广场、并与4号线、2号线形成换乘,向东走向与机场高速平行直至萧山国际机场,后沿北直到钱塘区,设有24个站点。该线为连接线,实现了城站火车站和萧山国际机场的轨道连接,进一步加强了钱江新城和钱江世纪城两个CBD的直接联系,同时在萧山境内沿建设三路、建设四路发展轴辐射,是未来的一条主要轨道线路。其中,地铁7号线市民中心站(杭州地铁4号线与7号线的换乘站)于2013年5月17日开工。7号线首通段为奥体中心站至江东二路站,全长约39.3公里,于2020年12月30日开通运营。过江段为奥体中心站至市民中心站,全长约3.0km,于2021年9月17日开通运营。全线于2022年4月1日建成通车运营,全程约63分钟;而从吴山广场至萧山国际机场共16个站,需时43分钟。 (zh)
|
rdfs:label
|
- Ligne 7 du métro de Hangzhou (fr)
- Line 7 (Hangzhou Metro) (en)
- 杭州地下鉄7号線 (ja)
- 杭州地铁7号线 (zh)
|
owl:sameAs
| |
prov:wasDerivedFrom
| |
foaf:depiction
| |
foaf:isPrimaryTopicOf
| |
foaf:name
| |
is dbo:operator
of | |
is dbo:wikiPageDisambiguates
of | |
is dbo:wikiPageRedirects
of | |
is dbo:wikiPageWikiLink
of | |
is foaf:primaryTopic
of | |