An Entity of Type: Rapid transit, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org:8891

Line 2 of the Changsha Metro (Chinese: 长沙地铁二号线; pinyin: Chǎngshā Dìtiě Èr Hào Xiàn) is a rapid transit line running from west to east Changsha crossing the Xiang River. The Phase 1 of the line was opened on 29 April 2014 with 19 stations, and the western extension opened on 28 December 2015 with 4 stations. This line is 26.57 km long with 23 stations.

Property Value
dbo:abstract
  • Line 2 of the Changsha Metro (Chinese: 长沙地铁二号线; pinyin: Chǎngshā Dìtiě Èr Hào Xiàn) is a rapid transit line running from west to east Changsha crossing the Xiang River. The Phase 1 of the line was opened on 29 April 2014 with 19 stations, and the western extension opened on 28 December 2015 with 4 stations. This line is 26.57 km long with 23 stations. (en)
  • 長沙地下鉄2号線(ちょうさちかてつ2ごうせん、中文表記: 长沙地铁2号线、英文表記: Changsha Metro Line 2)は、中華人民共和国湖南省長沙市岳麓区の梅渓湖西駅から長沙県の光達駅までを結ぶ長沙地下鉄の路線。2014年4月29日に開業された。 (ja)
  • 창사 지하철 2호선 (长沙地铁2号线)은 중국 후난성 창사에 있는 지하철 노선 중 하나이다. 창사 지하철가 운영한다. (ko)
  • 长沙地铁2号线是长沙第一条地铁线路,标志色为冰蓝色,全长26.579千米,自西向东经过岳麓区、天心区、开福区、芙蓉区、雨花区和长沙县五区一县,连接、火车站、火车南站等交通枢纽。全线设车站23座,其中换乘站9座(截至第三期建设规划),于线路东端设与综合基地。 2号线目前建成两期工程。一期工程自望城坡站至光达站,长21.926千米,共设车站19座,于2009年9月28日开工,2014年4月29日通车运营;西延一期工程从梅溪湖西站到望城坡站(不含),长4.449千米,共设车站4座,于2011年11月18日开工建设,2015年12月28日通车。西延二期工程已纳入长沙市轨道交通第三期建设规划,自长沙西站至梅溪湖西站(不含),长13.99公里,设站11座,全部为地下站,暂未开工建设。 (zh)
dbo:isPartOf
dbo:lineLength
  • 26570.000000 (xsd:double)
dbo:location
dbo:numberOfStations
  • 23 (xsd:nonNegativeInteger)
dbo:openingDate
  • 2014-04-29 (xsd:date)
dbo:openingYear
  • 2014-01-01 (xsd:gYear)
dbo:operator
dbo:status
  • Operational
dbo:thumbnail
dbo:type
dbo:wikiPageID
  • 42656643 (xsd:integer)
dbo:wikiPageLength
  • 6512 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1095414266 (xsd:integer)
dbo:wikiPageWikiLink
dbp:caption
  • Line 2 train at Yingwanzhen station (en)
dbp:character
  • Underground (en)
dbp:imageWidth
  • 270 (xsd:integer)
dbp:locale
dbp:logo
  • CS Line 2 icon.svg (en)
dbp:logoWidth
  • 100 (xsd:integer)
dbp:mapState
  • collapsed (en)
dbp:open
  • 2014-04-29 (xsd:date)
dbp:operator
dbp:owner
  • Changsha Government (en)
dbp:p
  • Chǎngshā Dìtiě Èr Hào Xiàn (en)
dbp:routes
  • 1 (xsd:integer)
dbp:s
  • 长沙地铁二号线 (en)
dbp:stations
  • 23 (xsd:integer)
dbp:status
  • Operational (en)
dbp:system
dbp:tracks
  • 2 (xsd:integer)
dbp:type
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • Line 2 of the Changsha Metro (Chinese: 长沙地铁二号线; pinyin: Chǎngshā Dìtiě Èr Hào Xiàn) is a rapid transit line running from west to east Changsha crossing the Xiang River. The Phase 1 of the line was opened on 29 April 2014 with 19 stations, and the western extension opened on 28 December 2015 with 4 stations. This line is 26.57 km long with 23 stations. (en)
  • 長沙地下鉄2号線(ちょうさちかてつ2ごうせん、中文表記: 长沙地铁2号线、英文表記: Changsha Metro Line 2)は、中華人民共和国湖南省長沙市岳麓区の梅渓湖西駅から長沙県の光達駅までを結ぶ長沙地下鉄の路線。2014年4月29日に開業された。 (ja)
  • 창사 지하철 2호선 (长沙地铁2号线)은 중국 후난성 창사에 있는 지하철 노선 중 하나이다. 창사 지하철가 운영한다. (ko)
  • 长沙地铁2号线是长沙第一条地铁线路,标志色为冰蓝色,全长26.579千米,自西向东经过岳麓区、天心区、开福区、芙蓉区、雨花区和长沙县五区一县,连接、火车站、火车南站等交通枢纽。全线设车站23座,其中换乘站9座(截至第三期建设规划),于线路东端设与综合基地。 2号线目前建成两期工程。一期工程自望城坡站至光达站,长21.926千米,共设车站19座,于2009年9月28日开工,2014年4月29日通车运营;西延一期工程从梅溪湖西站到望城坡站(不含),长4.449千米,共设车站4座,于2011年11月18日开工建设,2015年12月28日通车。西延二期工程已纳入长沙市轨道交通第三期建设规划,自长沙西站至梅溪湖西站(不含),长13.99公里,设站11座,全部为地下站,暂未开工建设。 (zh)
rdfs:label
  • Line 2 (Changsha Metro) (en)
  • 창사 지하철 2호선 (ko)
  • 長沙地下鉄2号線 (ja)
  • 长沙地铁2号线 (zh)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
is dbo:wikiPageDisambiguates of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License