dbo:Infrastructure/length
| |
dbo:abstract
|
- Jorethang Loop Hydroelectric project is a 96 megawatts (129,000 hp), run-of-the-river hydroelectric power station on the Rangit river in South Sikkim district of Sikkim state in India. The dam is located near village Piple and power station is located about 13 km downstream near village Majhitar. Dans Energy Private Limited was awarded contract for construction of the project. The project was officially inaugurated on 29 October 2015. The project was built at a cost of Rs 1,182 crores. (en)
- ГЕС Джоретанг (англ. Jorethang Loop Hydro-Electric Project, JLHEP) – гідроелектростанція на сході Індії у штаті Сіккім. Знаходячись після ГЕС Ранґіт IV, становить нижній ступінь в каскаді на річці Ранґіт, правій притоці Тісти (дренує східну частину Гімалаїв між Непалом та Бутаном і в свою чергу впадає праворуч до Брахмапутри). В межах проекту річку перекрили водозабірною греблею висотою 17 метрів та довжиною 108 метрів, яка утримує мале сховище з площею поверхні лише 0,14 км2. Звідси вода спрямовується у прокладений через лівобережний гірський масив дериваційний тунель довжиною 6,8 км, з’єднаний на завершальному етапі з балансувальною камерою шахтного типу висотою 62 метри та діаметром 25 метрів. Далі ресурс потрапляє у напірний водовід довжиною 315 метрів та діаметром 6 метрів, що виводить до наземного машинного залу. Основне обладнання станції становлять дві турбіни типу Френсіс потужністю по 48 МВт, які при напорі у 80 метрів забезпечують виробництво 535 млн кВт-год електроенергії на рік. Відпрацьована вода повертається в річку по відвідному каналу довжиною 40 метрів. Видача продукції відбувається по ЛЕП, розрахованій на роботу під напругою 220 кВ. (uk)
|
dbo:country
| |
dbo:description
| |
dbo:height
| |
dbo:lake
| |
dbo:length
| |
dbo:location
| |
dbo:openingDate
| |
dbo:openingYear
| |
dbo:owner
| |
dbo:part
| |
dbo:river
| |
dbo:thumbnail
| |
dbo:wikiPageExternalLink
| |
dbo:wikiPageID
| |
dbo:wikiPageLength
|
- 6907 (xsd:nonNegativeInteger)
|
dbo:wikiPageRevisionID
| |
dbo:wikiPageWikiLink
| |
dbp:cost
| |
dbp:damCrosses
| |
dbp:damType
| |
dbp:location
| |
dbp:locationMap
| |
dbp:locationMapCaption
| |
dbp:name
|
- Jorethang Loop Hydroelectric project (en)
|
dbp:nameOfficial
|
- Jorethang Loop Hydroelectric project (en)
|
dbp:opening
| |
dbp:operator
|
- Sikkim Renewable Energy Development Agency (en)
|
dbp:owner
| |
dbp:plantAnnualGen
| |
dbp:plantCapacity
| |
dbp:plantCommission
| |
dbp:plantTurbines
| |
dbp:plantType
| |
dbp:spillwayCapacity
| |
dbp:wikiPageUsesTemplate
| |
dcterms:subject
| |
georss:point
|
- 27.1375 88.30027777777778
|
rdf:type
| |
rdfs:comment
|
- Jorethang Loop Hydroelectric project is a 96 megawatts (129,000 hp), run-of-the-river hydroelectric power station on the Rangit river in South Sikkim district of Sikkim state in India. The dam is located near village Piple and power station is located about 13 km downstream near village Majhitar. Dans Energy Private Limited was awarded contract for construction of the project. The project was officially inaugurated on 29 October 2015. The project was built at a cost of Rs 1,182 crores. (en)
- ГЕС Джоретанг (англ. Jorethang Loop Hydro-Electric Project, JLHEP) – гідроелектростанція на сході Індії у штаті Сіккім. Знаходячись після ГЕС Ранґіт IV, становить нижній ступінь в каскаді на річці Ранґіт, правій притоці Тісти (дренує східну частину Гімалаїв між Непалом та Бутаном і в свою чергу впадає праворуч до Брахмапутри). Основне обладнання станції становлять дві турбіни типу Френсіс потужністю по 48 МВт, які при напорі у 80 метрів забезпечують виробництво 535 млн кВт-год електроенергії на рік. Відпрацьована вода повертається в річку по відвідному каналу довжиною 40 метрів. (uk)
|
rdfs:label
|
- Jorethang Loop Hydroelectric project (en)
- ГЕС Джоретанг (uk)
|
owl:sameAs
| |
geo:geometry
|
- POINT(88.300277709961 27.137500762939)
|
geo:lat
| |
geo:long
| |
prov:wasDerivedFrom
| |
foaf:depiction
| |
foaf:isPrimaryTopicOf
| |
foaf:name
|
- Jorethang Loop Hydroelectric project (en)
|
is dbo:wikiPageWikiLink
of | |
is foaf:primaryTopic
of | |