dbo:abstract
|
- The Zhangjiajie–Jishou–Huaihua high-speed railway is a high-speed railway in China. It is 246.9 kilometres (153.4 mi) long and have a design speed of 350 kilometres per hour (220 mph). The line runs parallel to the Jiaozuo–Liuzhou railway, but on a faster alignment. It was opened on 6 December 2021. (en)
- 张吉怀高速铁路,是一条连接中国湖南省张家界市经吉首市至怀化市的南北走向高速铁路,于2016年12月开工建设,计划工期5年。2021年12月6日,张吉怀高速铁路正式开通运营。 (zh)
|
dbo:lineLength
|
- 246900.000000 (xsd:double)
|
dbo:numberOfStations
|
- 7 (xsd:nonNegativeInteger)
|
dbo:openingDate
| |
dbo:openingYear
| |
dbo:routeEnd
| |
dbo:routeStart
| |
dbo:speedLimit
| |
dbo:status
| |
dbo:type
| |
dbo:wikiPageID
| |
dbo:wikiPageLength
|
- 3621 (xsd:nonNegativeInteger)
|
dbo:wikiPageRevisionID
| |
dbo:wikiPageWikiLink
| |
dbp:electrification
| |
dbp:end
| |
dbp:name
|
- (en)
- high-speed railway (en)
- Zhangjiajie–Jishou–Huaihua (en)
|
dbp:nativeName
| |
dbp:open
| |
dbp:start
| |
dbp:stations
| |
dbp:status
| |
dbp:type
| |
dbp:wikiPageUsesTemplate
| |
dcterms:subject
| |
rdf:type
| |
rdfs:comment
|
- The Zhangjiajie–Jishou–Huaihua high-speed railway is a high-speed railway in China. It is 246.9 kilometres (153.4 mi) long and have a design speed of 350 kilometres per hour (220 mph). The line runs parallel to the Jiaozuo–Liuzhou railway, but on a faster alignment. It was opened on 6 December 2021. (en)
- 张吉怀高速铁路,是一条连接中国湖南省张家界市经吉首市至怀化市的南北走向高速铁路,于2016年12月开工建设,计划工期5年。2021年12月6日,张吉怀高速铁路正式开通运营。 (zh)
|
rdfs:label
|
- Zhangjiajie–Jishou–Huaihua high-speed railway (en)
- 张吉怀高速铁路 (zh)
|
owl:sameAs
| |
prov:wasDerivedFrom
| |
foaf:isPrimaryTopicOf
| |
foaf:name
|
- high-speed railway (en)
- Zhangjiajie–Jishou–Huaihua (en)
|
is dbo:servingRailwayLine
of | |
is dbo:wikiPageRedirects
of | |
is dbo:wikiPageWikiLink
of | |
is dbp:line
of | |
is foaf:primaryTopic
of | |