The Xiangjiaba–Shanghai HVDC system is a ±800 kV, 6400 MW high-voltage direct current transmission system in China. The system was built to export hydro power from Xiangjiaba Dam in Sichuan province, to the major city of Shanghai. Built and owned by State Grid Corporation of China (SGCC), the system became the world’s largest-capacity HVDC system when it was completed in July 2010, although it has already been overtaken by the 7200 MW Jinping–Sunan HVDC scheme which was put into operation in December 2012. It also narrowly missed becoming the world’s first 800 kV HVDC line, with the first pole of the Yunnan–Guangdong project having been put into service 6 months earlier.It was also the world’s longest HVDC line when completed, although that record is also expected to be overtaken early in

Property Value
dbo:abstract
  • Die HGÜ Xianjiaba-Shanghai ist eine Hochspannungs-Gleichstrom-Übertragungsleitung (HGÜ) in der Volksrepublik China zwischen dem Wasserkraftwerk bei der Xiangjiaba-Talsperre an der Grenze zwischen den Provinzen Sichuan (Yibin) und Yunnan (Shuifu) und der im Osten Chinas gelegenen Metropole Shanghai. Die im April 2007 begonnene und im Juli 2010 fertiggestellte Leitung weist bei einer Länge von 2070 km eine Übertragungsleistung von 6400 MW auf, dies entspricht mit Stand 2010 ca. einem Drittel des Spitzenverbrauchs der Metropole Shanghai, und wird von der State Grid Corporation betrieben. Zum Zeitpunkt der Inbetriebnahme war sie die weltweit längste HGÜ-Leitung und ist nach der HGÜ Yunnan–Guangdong die zweite bipolare HGÜ-Anlage Chinas welche im Endausbau mit einer Betriebsspannung von ±800 kV betrieben wird. Die westliche Stromrichterstation Fulong und Beginn der Leitung ist ca. 10 km von der Xiangjiaba-Talsperre entfernt (Koordinate: 28° 32′ 47,0″ N, 104° 25′ 04,0″ O) und wird von vier Drehstromsystemen mit je 500 kV von den Wasserkraftwerk der Talsperre gespeist. Die von Siemens errichtete Anlage umfasst zehn Stromrichtertransformatoren. Die östliche und von ABB errichtete Stromrichterstation Fengxia und Ende der Leitung befindet sich ca. 45 km süd-östlich von Shanghai (Koordinate: 30° 55′ 32,0″ N, 121° 46′ 16,0″ O) und speist die elektrische Energie über drei Drehstromsysteme zu je 500 kV in das öffentliche Stromnetz im Großraum Shanghai ein. (de)
  • Xianjiaba-Shanghaï est une liaison à courant continu chinoise reliant le barrage de Xiangjiaba, se trouvant à la frontière entre les provinces de Sichuan et de Yunnan, à Shanghai. Elle a été mise en service en juillet 2010. Il s'agit de la deuxième liaison utilisant une tension continue de ±800 kV après Yunnan - Guangdong. Elle a une puissance nominale de 6 400 MW, ce qui en fait la plus puissante liaison à courant continu au monde lors de son inauguration et représente près d'un tiers du pic de consommation de la métropole de Shanghai. Elle a une longueur de 2 070 km, ce qui est au moment de son inauguration également un record mondial. Depuis la l'a dépassée pour la puissance et la liaison Rio Madeira pour la longueur. Le poste ouest s'appelle Fulong et est situé à une dizaine de kilomètres du barrage. Il est alimenté grâce à quatre systèmes alternatifs 500 kV. Il a été construit par Siemens. Le poste est s'appelle Fengxia et est distant de 45 km au Sud-Est de Shanghaï et alimente trois systèmes alternatifs 500 kV. Il a été construit par ABB. C'est une liaison bipolaire, mais chaque pôle est constitué de deux groupes de valves à 12 pulsations en série au lieu d'un dans les designs classiques. La ligne est exploitée par State Grid Corporation. (fr)
  • The Xiangjiaba–Shanghai HVDC system is a ±800 kV, 6400 MW high-voltage direct current transmission system in China. The system was built to export hydro power from Xiangjiaba Dam in Sichuan province, to the major city of Shanghai. Built and owned by State Grid Corporation of China (SGCC), the system became the world’s largest-capacity HVDC system when it was completed in July 2010, although it has already been overtaken by the 7200 MW Jinping–Sunan HVDC scheme which was put into operation in December 2012. It also narrowly missed becoming the world’s first 800 kV HVDC line, with the first pole of the Yunnan–Guangdong project having been put into service 6 months earlier.It was also the world’s longest HVDC line when completed, although that record is also expected to be overtaken early in 2013 with the completion of the first bipole of the Rio Madeira project in Brazil. Various values are quoted for the length of the Xiangjiaba–Shanghai DC line, ranging from 1,907 kilometres (1,185 mi) to 2,070 kilometres (1,290 mi), but in any event the line is significantly longer than that of the 1,700 kilometres (1,100 mi) Inga–Shaba project in Democratic Republic of Congo which had held the record since 1982. Significant design and development work had to be performed to qualify the specialised equipment for operation at 800 kV. The design is a bipolar system with overhead lines for the high-voltage conductors and ground return for the neutral current. However, because of the very high operating voltage and power, each pole contains two twelve pulse bridges in series at each end. (en)
dbo:thumbnail
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 38150156 (xsd:integer)
dbo:wikiPageLength
  • 7498 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1050707854 (xsd:integer)
dbo:wikiPageWikiLink
dbp:capacity
  • 6400.0
dbp:country
dbp:currentType
dbp:dcVoltage
  • ±800 kV (en)
dbp:est
  • 2010 (xsd:integer)
dbp:finish
dbp:lengthKm
  • 2000 (xsd:integer)
dbp:mapCaption
  • Location of Xiangjiaba–Shanghai HVDC system (en)
dbp:name
  • Xiangjiaba–Shanghai HVDC system (en)
dbp:owner
dbp:polesNo
  • 2 (xsd:integer)
dbp:start
dbp:substationInstaller
dbp:substationManufacturer
dbp:type
  • Transmission (en)
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
georss:point
  • 28.546388888888888 104.41777777777777
rdf:type
rdfs:comment
  • Die HGÜ Xianjiaba-Shanghai ist eine Hochspannungs-Gleichstrom-Übertragungsleitung (HGÜ) in der Volksrepublik China zwischen dem Wasserkraftwerk bei der Xiangjiaba-Talsperre an der Grenze zwischen den Provinzen Sichuan (Yibin) und Yunnan (Shuifu) und der im Osten Chinas gelegenen Metropole Shanghai. Die im April 2007 begonnene und im Juli 2010 fertiggestellte Leitung weist bei einer Länge von 2070 km eine Übertragungsleistung von 6400 MW auf, dies entspricht mit Stand 2010 ca. einem Drittel des Spitzenverbrauchs der Metropole Shanghai, und wird von der State Grid Corporation betrieben. Zum Zeitpunkt der Inbetriebnahme war sie die weltweit längste HGÜ-Leitung und ist nach der HGÜ Yunnan–Guangdong die zweite bipolare HGÜ-Anlage Chinas welche im Endausbau mit einer Betriebsspannung von ±800 kV (de)
  • Xianjiaba-Shanghaï est une liaison à courant continu chinoise reliant le barrage de Xiangjiaba, se trouvant à la frontière entre les provinces de Sichuan et de Yunnan, à Shanghai. Elle a été mise en service en juillet 2010. Il s'agit de la deuxième liaison utilisant une tension continue de ±800 kV après Yunnan - Guangdong. Elle a une puissance nominale de 6 400 MW, ce qui en fait la plus puissante liaison à courant continu au monde lors de son inauguration et représente près d'un tiers du pic de consommation de la métropole de Shanghai. Elle a une longueur de 2 070 km, ce qui est au moment de son inauguration également un record mondial. Depuis la l'a dépassée pour la puissance et la liaison Rio Madeira pour la longueur. (fr)
  • The Xiangjiaba–Shanghai HVDC system is a ±800 kV, 6400 MW high-voltage direct current transmission system in China. The system was built to export hydro power from Xiangjiaba Dam in Sichuan province, to the major city of Shanghai. Built and owned by State Grid Corporation of China (SGCC), the system became the world’s largest-capacity HVDC system when it was completed in July 2010, although it has already been overtaken by the 7200 MW Jinping–Sunan HVDC scheme which was put into operation in December 2012. It also narrowly missed becoming the world’s first 800 kV HVDC line, with the first pole of the Yunnan–Guangdong project having been put into service 6 months earlier.It was also the world’s longest HVDC line when completed, although that record is also expected to be overtaken early in (en)
rdfs:label
  • HGÜ Xianjiaba–Shanghai (de)
  • Ligne électrique Xiangjiaba - Shanghai (fr)
  • Xiangjiaba–Shanghai HVDC system (en)
owl:sameAs
geo:geometry
  • POINT(104.41777801514 28.546388626099)
geo:lat
  • 28.546389 (xsd:float)
geo:long
  • 104.417778 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License