An Entity of Type: Band, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The Vitimsky Hydroelectric Power Plant (HPP) Cascade is a proposed group of hydropower plants on the Vitim River in the Buryatia and Irkutsk regions of Russia. The first stage consists of the proposed Mokskaya HPP, with a planned capacity of 1,200 MW, and an average annual production of c. 4.54 billion kWh. The second stage consists of the projected Ivanovo HPP, with a planned capacity of 210 MW, and an average annual production of c. 1.03 billion kWh. The third stage: the projected Yangudinskaya HPP, with a planned capacity of 360 MW.

Property Value
dbo:abstract
  • The Vitimsky Hydroelectric Power Plant (HPP) Cascade is a proposed group of hydropower plants on the Vitim River in the Buryatia and Irkutsk regions of Russia. The first stage consists of the proposed Mokskaya HPP, with a planned capacity of 1,200 MW, and an average annual production of c. 4.54 billion kWh. The second stage consists of the projected Ivanovo HPP, with a planned capacity of 210 MW, and an average annual production of c. 1.03 billion kWh. The third stage: the projected Yangudinskaya HPP, with a planned capacity of 360 MW. The fourth stage: the projected Karalonskaya HPP, with a planned capacity of 450 MW. The fifth stage: the projected Signayskaya HPP, with a planned capacity of 590 MW. The sixth stage: the projected Bodaibo HPP, with a planned capacity of 600 MW. (en)
dbo:wikiPageID
  • 44845915 (xsd:integer)
dbo:wikiPageLength
  • 1326 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1049111196 (xsd:integer)
dbo:wikiPageWikiLink
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
rdf:type
rdfs:comment
  • The Vitimsky Hydroelectric Power Plant (HPP) Cascade is a proposed group of hydropower plants on the Vitim River in the Buryatia and Irkutsk regions of Russia. The first stage consists of the proposed Mokskaya HPP, with a planned capacity of 1,200 MW, and an average annual production of c. 4.54 billion kWh. The second stage consists of the projected Ivanovo HPP, with a planned capacity of 210 MW, and an average annual production of c. 1.03 billion kWh. The third stage: the projected Yangudinskaya HPP, with a planned capacity of 360 MW. (en)
rdfs:label
  • Vitimsky HPP Cascade (en)
owl:sameAs
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License