Uwada Dam is a gravity dam on the Tadami River 500 m (1,640 ft) downstream of Kaneyama in the Fukushima Prefecture of Japan. It was constructed between 1952 and 1954 for the purpose of hydroelectric power generation. It supplies a 63.9 MW power station with water.

Property Value
dbo:Infrastructure/length
  • 0.283
dbo:abstract
  • Uwada Dam is a gravity dam on the Tadami River 500 m (1,640 ft) downstream of Kaneyama in the Fukushima Prefecture of Japan. It was constructed between 1952 and 1954 for the purpose of hydroelectric power generation. It supplies a 63.9 MW power station with water. (en)
  • La diga di Uwada (上田ダム Uwada damu?) è una diga a gravità sul , 500 km a valle di Kaneyama nella prefettura di Fukushima, in Giappone. Fu costruita tra il 1952 e il 1954 ai fini della produzione di energia idroelettrica. Essa alimenta con l'acqua una centrale idroelettrica da 92 MW che consiste di 2 turbine Kaplan da 46 MW. (it)
dbo:buildingStartDate
  • 1952
dbo:buildingStartYear
  • 1952-01-01 (xsd:gYear)
dbo:country
dbo:height
  • 34.000000 (xsd:double)
dbo:lake
dbo:length
  • 283.000000 (xsd:double)
dbo:location
dbo:openingYear
  • 1954-01-01 (xsd:gYear)
dbo:owner
dbo:part
dbo:river
dbo:thumbnail
dbo:volume
  • 23000.000000 (xsd:double)
dbo:wikiPageID
  • 19665876 (xsd:integer)
dbo:wikiPageLength
  • 3043 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1003698077 (xsd:integer)
dbo:wikiPageWikiLink
dbp:constructionBegan
  • 1952 (xsd:integer)
dbp:country
  • Japan (en)
dbp:damCrosses
dbp:location
dbp:locationMap
  • Japan (en)
dbp:name
  • Uwada Dam (en)
dbp:opening
  • 1954 (xsd:integer)
dbp:owner
dbp:plantCapacity
  • 63.9
dbp:plantCommission
  • March 1954 (en)
dbp:plantTurbines
  • 3 (xsd:integer)
dbp:spillwayType
  • 5 (xsd:integer)
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
georss:point
  • 37.48305555555555 139.53722222222223
rdf:type
rdfs:comment
  • Uwada Dam is a gravity dam on the Tadami River 500 m (1,640 ft) downstream of Kaneyama in the Fukushima Prefecture of Japan. It was constructed between 1952 and 1954 for the purpose of hydroelectric power generation. It supplies a 63.9 MW power station with water. (en)
  • La diga di Uwada (上田ダム Uwada damu?) è una diga a gravità sul , 500 km a valle di Kaneyama nella prefettura di Fukushima, in Giappone. Fu costruita tra il 1952 e il 1954 ai fini della produzione di energia idroelettrica. Essa alimenta con l'acqua una centrale idroelettrica da 92 MW che consiste di 2 turbine Kaplan da 46 MW. (it)
rdfs:label
  • Diga di Uwada (it)
  • Uwada Dam (en)
owl:sameAs
geo:geometry
  • POINT(139.53721618652 37.483055114746)
geo:lat
  • 37.483055 (xsd:float)
geo:long
  • 139.537216 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Uwada Dam (en)
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License