Tunnel A1 (Ivan) is a tunnel part of the A1 motorway in Bosnia and Herzegovina built by Autocesta FBiH. In January 2020 the first digging has been confirmed to have begun in the Herzegovina side of the tunnel. A total of 340,000,000 Euros (664,9 million KM) have been invested in the project to build the tunnel along with 11,4 million Euros for other expenses. The project is part of newly built A1 motorway section Tarčin-Ivan. The tunnel was expected to be completed by May 2022.

Property Value
dbo:abstract
  • Tunnel A1 (Ivan) is a tunnel part of the A1 motorway in Bosnia and Herzegovina built by Autocesta FBiH. In January 2020 the first digging has been confirmed to have begun in the Herzegovina side of the tunnel. A total of 340,000,000 Euros (664,9 million KM) have been invested in the project to build the tunnel along with 11,4 million Euros for other expenses. The project is part of newly built A1 motorway section Tarčin-Ivan. The tunnel was expected to be completed by May 2022. On October 31, 2022, following the completion of the Tarčin-Ivan motorway section, the tunnel opened along with the newly completed section. (en)
dbo:buildingEndDate
  • October 2022
dbo:buildingStartDate
  • January 2020
dbo:cost
  • 6.956E7
dbo:openingDate
  • 2022-10-31 (xsd:date)
dbo:openingYear
  • 2022-01-01 (xsd:gYear)
dbo:wikiPageID
  • 62965576 (xsd:integer)
dbo:wikiPageLength
  • 3321 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1119364133 (xsd:integer)
dbo:wikiPageWikiLink
dbp:begin
  • January 2020 (en)
dbp:bridgeName
  • Tunnel A1 (en)
dbp:complete
  • October 2022 (en)
dbp:cost
  • 6.956E7
dbp:design
  • Tunnel (en)
dbp:open
  • 2022-10-31 (xsd:date)
dbp:owner
  • JP Autoceste BIH (en)
dbp:wikiPageUsesTemplate
dcterms:subject
georss:point
  • 43.79198 18.0092
rdf:type
rdfs:comment
  • Tunnel A1 (Ivan) is a tunnel part of the A1 motorway in Bosnia and Herzegovina built by Autocesta FBiH. In January 2020 the first digging has been confirmed to have begun in the Herzegovina side of the tunnel. A total of 340,000,000 Euros (664,9 million KM) have been invested in the project to build the tunnel along with 11,4 million Euros for other expenses. The project is part of newly built A1 motorway section Tarčin-Ivan. The tunnel was expected to be completed by May 2022. (en)
rdfs:label
  • Tunnel A1 (Ivan) (en)
owl:sameAs
geo:geometry
  • POINT(18.009199142456 43.791980743408)
geo:lat
  • 43.791981 (xsd:float)
geo:long
  • 18.009199 (xsd:float)
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
foaf:name
  • Tunnel A1 (Ivan) (en)
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License