Three Cedars Solar Project is a 210 MWAC (265 MWp) photovoltaic power station consisting of three units extending about 15 miles northwest of Cedar City, Utah. The project was developed by SunEdison, built with its global team of partners, and commissioned in September 2016. The electricity and renewable energy credits are being sold to Rocky Mountain Power under three separate 20-year power purchase agreements.

Property Value
dbo:abstract
  • Three Cedars Solar Project is a 210 MWAC (265 MWp) photovoltaic power station consisting of three units extending about 15 miles northwest of Cedar City, Utah. The project was developed by SunEdison, built with its global team of partners, and commissioned in September 2016. The electricity and renewable energy credits are being sold to Rocky Mountain Power under three separate 20-year power purchase agreements. (en)
dbo:buildingStartDate
  • September 2015
dbo:buildingStartYear
  • 2015-01-01 (xsd:gYear)
dbo:capacityFactor
  • 29.500000 (xsd:float)
dbo:location
dbo:openingYear
  • 2016-01-01 (xsd:gYear)
dbo:operator
dbo:status
  • O
dbo:thumbnail
dbo:wikiPageID
  • 60219641 (xsd:integer)
dbo:wikiPageLength
  • 12283 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 994897108 (xsd:integer)
dbo:wikiPageWikiLink
dbp:commissioned
  • September 2016 (en)
dbp:constructionBegan
  • September 2015 (en)
dbp:cost
  • 4.0E8
dbp:country
  • United States (en)
dbp:imageCaption
  • Iron Springs Unit (en)
dbp:location
dbp:name
  • Three Cedars Solar Project (en)
dbp:operator
dbp:owner
  • Dominion Renewable Energy (en)
dbp:psAnnualGeneration
  • 543 (xsd:integer)
dbp:psElectricalCapFac
  • 29.5
dbp:psElectricalCapacity
  • 265 (xsd:integer)
dbp:solarType
dbp:status
  • O (en)
dbp:wikiPageUsesTemplate
dcterms:subject
georss:point
  • 37.721111111111114 -113.15166666666667
rdf:type
rdfs:comment
  • Three Cedars Solar Project is a 210 MWAC (265 MWp) photovoltaic power station consisting of three units extending about 15 miles northwest of Cedar City, Utah. The project was developed by SunEdison, built with its global team of partners, and commissioned in September 2016. The electricity and renewable energy credits are being sold to Rocky Mountain Power under three separate 20-year power purchase agreements. (en)
rdfs:label
  • Three Cedars Solar Project (en)
owl:sameAs
geo:geometry
  • POINT(-113.15166473389 37.721111297607)
geo:lat
  • 37.721111 (xsd:float)
geo:long
  • -113.151665 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Three Cedars Solar Project (en)
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License