An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Te Rere Hau is a wind farm owned and operated by New Zealand Windfarms Ltd. It is situated on the Tararua Ranges, approximately 11 km east of Palmerston North in New Zealand. In 2003, New Zealand Windfarms were assisted by the New Zealand government under the Projects to Reduce Emissions program and were issued with Kyoto Protocol emission units for the proposal on the grounds that it would reduce emissions of greenhouse gases. In April 2022, NZ Windfarms announced plans to repower the farm, replacing its Windflow-500 turbines with larger, three-bladed turbines.

Property Value
dbo:abstract
  • Te Rere Hau is a wind farm owned and operated by New Zealand Windfarms Ltd. It is situated on the Tararua Ranges, approximately 11 km east of Palmerston North in New Zealand. In 2003, New Zealand Windfarms were assisted by the New Zealand government under the Projects to Reduce Emissions program and were issued with Kyoto Protocol emission units for the proposal on the grounds that it would reduce emissions of greenhouse gases. The first stage was officially opened in September 2006 by RT Hon Helen Clark and it consisted of five 500 kW turbines. Stage 2 (28 turbines) and Stage 3 (32 turbines) were completed in 2009. The final Stage 4 (32 turbines) was completed in 2011. In total Te Rere Hau has 97 wind turbines with a generating capacity of 48.5 MW, which is enough to power approximately 18,000 local households. The turbines generated a total of 123 GWh in the year up to June 2015. The Windflow 500 turbines, made in New Zealand by Windflow Technology, stand 30 metres high with a rotor diameter of 33 metres. They have a two-bladed design, making them easily distinguishable from those of the nearby Tararua and Te Apiti wind farms. Te Rere Hau is the first commercial wind farm in the country to use locally manufactured wind turbines. By using turbines that have been designed and made in New Zealand, over 90% of the project cost stays in the country. In July 2012, after frequent complaints over noise, Palmerston North City Council (PNCC) took a case against the owners to the Environment Court. The court ruled that NZ Windfarms was in breach of noise limits stated in its resource consent and that the noise predictions supplied by NZ Windfarms in the resource consent application were wrong. PNCC CEO Paddy Clifford stated "we can start working towards a resolution with NZ Windfarms". The Environment Court ruling was successfully appealed to the High Court with judgment delivered in June 2013. The Palmerston North City Council then failed in its appeal of the High Court decision to the Court of Appeal with judgment delivered in December 2014. In April 2022, NZ Windfarms announced plans to repower the farm, replacing its Windflow-500 turbines with larger, three-bladed turbines. (en)
dbo:installedCapacity
  • 48500000.000000 (xsd:double)
dbo:location
dbo:openingYear
  • 2011-01-01 (xsd:gYear)
dbo:owner
dbo:thumbnail
dbo:wikiPageID
  • 10909083 (xsd:integer)
dbo:wikiPageLength
  • 4962 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1102501976 (xsd:integer)
dbo:wikiPageWikiLink
dbp:commissioned
  • 2011 (xsd:integer)
dbp:country
  • New Zealand (en)
dbp:location
dbp:name
  • Te Rere Hau Wind Farm (en)
dbp:owner
dbp:psElectricalCapacity
  • 48.5
dbp:psUnitsOperational
  • 97 (xsd:integer)
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
georss:point
  • -40.388333333333335 175.72416666666666
rdf:type
rdfs:comment
  • Te Rere Hau is a wind farm owned and operated by New Zealand Windfarms Ltd. It is situated on the Tararua Ranges, approximately 11 km east of Palmerston North in New Zealand. In 2003, New Zealand Windfarms were assisted by the New Zealand government under the Projects to Reduce Emissions program and were issued with Kyoto Protocol emission units for the proposal on the grounds that it would reduce emissions of greenhouse gases. In April 2022, NZ Windfarms announced plans to repower the farm, replacing its Windflow-500 turbines with larger, three-bladed turbines. (en)
rdfs:label
  • Te Rere Hau Wind Farm (en)
owl:sameAs
geo:geometry
  • POINT(175.72416687012 -40.388332366943)
geo:lat
  • -40.388332 (xsd:float)
geo:long
  • 175.724167 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Te Rere Hau Wind Farm (en)
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License